14 Irvine Rd
Greenwich, CTSecond floor: 1 tub, shower, sink, and toilet.
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Second floor: 1 tub, shower, sink, and toilet.
Second floor: Replace 2 water closets, showers, and tubs; replace 3 sinks.
Add a kitchen and bathroom.
$2.1KFirst floor: move: sink, laundry tub, clothes washer.
(APT 3-B) : First floor: 1 sink, second floor.: 1 shower, sink replace, 2 toilets, 2 sinks, 1 shower, and 1 kitchen.
First floor: add 1 sink (add one 1/, 2 bathroom and 1 kitchen).
Replace fixtures on existing bathroom toilets, vanities, shower, and tub in the basement bathroom, guest bathroom, aster bedroom, kids' bathroom, and new bathroom.
Plumbing work in 4 bathrooms, 1 lavatory, and kitchen.
Basement work: Install 1 full bathroom, 1 laundry, and 1 sump pump. Basement: New sink, shower, and clothes washer.
Install 4 sinks and 1 electrical. Hot water heater, up to 10 gals.
Replace all apartment fixtures: 1 half bathroom and 1 kitchen sink. Replace water lines inside the apartment for the shower and full-bath sink.
Install AARN Unit 1. 1.3 tons. Amendment (1/7/20): Install makeup air and exhaust hoods I and II.
Install rough plumbing and fixtures for 1 full bath.
First floor: 1 water closet and sink. Install water and sewer line for half bathroom, toilet, and sink using PVC pipe 2", 3", and 1 1/2", and PEX 1/2".
Second floor: 1 water closet, tub, shower, and floor drain; 2 sinks; piping.
First floor: 1 sink; replace second-floor toilet waste line; replace waterlines for kitchen sink; move laundry plumbing 5 ft. In the same room.
201801983 – Second floor: 1 laundry tub; run 10 ft. Of gas pipe for new laundry; install plumbing for new laundry on the second floor.
First floor: 1 laundry tub, dishwasher; install new laundry, waste, and cold/hot domestic water lines.
Outside deck; install a gas line for the grill and fireplace, and install a sink and Jacuzzi tub.
Second floor: 1 water closet, shower, and sink; relocating drain and water lines; reinstalling toilet and installation of a new double sink/shower fixture.