14 Koger Rd
Trumbull, CT- 2021Plumbing
Plumbing to code for bathroom prior to permit.
$1K
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
No contact information was found in the available records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Plumbing to code for bathroom prior to permit.
$1KExisting 150 kW BTU; boiler conversion, oil tank removal, new gas line from tank to boiler, and two sets of hydro lines.
$14KInstall a new tub, toilet, and shower in the same location; add a second sink.
$3KGarage/poolhouse, radiant heat: 1 zone, 52 K BTU heat, 98 K BTU hot water.
Second floor: Replace 1 water closet, tub, shower, and 2 basins.
Replace existing oil boiler with a new gas boiler: 126000 BTU; add balance values and circulator.
Gas piping only: First floor: 4 fireplaces and 1 stove. Second floor: 1 fireplace, 2 dryers, 1 outdoor grill, and 1 boiler; underground to the pool house for a pool heater and future generator. 12 fixtures only.
Bring a line from a new location into the house to the new boiler; install new gas lines to the grill and kitchen stove, and a new gas line to the pool house; replace the existing boiler with a high-efficiency Buderus boiler of the same size, with 7 existing zones; replace the circular with a new one and install a new control. Note: Chimney relining by others.
$27KGas line to generator. Receipt 18-1956 for $40 paid.
Plumbing: Move the existing shower and sink, replace the water closet in its existing location, and move the washing machine hookup.
$3.5KGas line to generator. Receipt 17-2443 for $40 paid.
Add 2 zones to the existing boiler and run a hydro-line for others; also add a new gas line for the kitchen stove.
Extend existing heat to new addition.
Natural gas lines to boiler and stove; 200000 BTU output for 2 hydro air heaters, basement and attic hydro lines units; 2 heat zones, 1 DHWH zone. Amendment (6/6/18): add future underground gas line to future location, 1 1/2" natural gas line only.
Gas piping only for 3 fixtures (boiler by others), stove on the first floor, and fireplace only.
Boiler with 62/100 BTU right zones; 1 DHWH, 4 A/R handlers, 1 radiant zone, 2 garage heat zones.
Replace 140k BTU boiler with 200 k BTU boiler; add 1 new zone for garage heater, plus redo, 3 existing zones with new pumps and valves.
Replace existing boiler with navien gas boiler with dhwd and 2 sets of hydro lines to air handlers; gas pipe boiler, stoves, and tee off for future generator.