Documented work across Connecticut based on attributed municipal records.

Reported work volume$1.3MDocumented jobs
Average project$253KWhere values are reported
First observed2022Available dataset
Categories6Observed work types
Used for work inGreenwich6 jobsNew Canaan1 jobsStamford1 jobs

Contact information

Details found in public records

These details have not necessarily been claimed or independently confirmed by the provider.

Phone
914-447-4276source record
Phone
9145220673source record

Work history

Documented work by property

Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.

Satellite view of 168 Lost District Dr, New Canaan, CTSatellite view
2025

168 Lost District Dr

New Canaan, CT
  • 2025Renovation

    Installation of new windows, NanaWall, skylights, and a sliding door for the kitchen/sunroom; structural steel and timber framing to accommodate; footing/foundation work necessary for glass installation and structural framing; all interior electrical roughing and finishing for the kitchen and sunroom only; installation of cabinets and finish carpentry. Work per attached plan. No work on the property not included on this plan is covered by this permit. BPR-25-46: fabrication of a deck around the renovated sunroom.

    $150K
Satellite view of 86 Wildwood Rd, Stamford, CTSatellite view
2022

86 Wildwood Rd

Stamford, CT
  • 2022Demolition

    Renovate the kitchen and bathrooms and install new flooring throughout. Demolish the third bathroom. All bathrooms will receive new plumbing, plumbing fixtures, insulation, cement board, etc. Add 4 new windows and replace, 6 windows, enlarging the openings. Demolish the existing kitchen, remove the basement stairs, and change the closet layout in this area, which is approximately 530sf, with new framing. This is over approximately 3600sf. Add support underneath the existing deck, approximately 500sf. On 10/31/2022, the HVAC system was added to the scope of work, with an additional cost of $34,000.00 (MTC).

    $300K