Western Junior Hwy
Greenwich, CTAlteration
$148KLocal provider profile
Documented work across Connecticut based on attributed municipal records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Alteration
$148KPlumbing for 2 outdoor bathrooms, replace 2 sinks, 2 toilets, 1 urinal, 1 well pressure tank.
$9.8KConnect a new dryer exhaust outlet to the existing system for a new dryer.
$3.8KConnect a new dryer exhaust outlet to the existing system for a new dryer.
$3.8KCommercial Plumbing
$19.8KHVAC for the second floor: ductwork, hot-water piping, VAV boxes, and controls for Henkel.
$182KHVAC for the second floor: ductwork, hot-water piping, VAV boxes, and controls for Henkel.
$182KPiping per approved plans for Henkel.
$159KInstall a 600 CFM exhaust fan and relocate HW piping.
$9K