15 Skyridge Rd
Greenwich, CTPlumbing Work
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Plumbing Work
2500 ROLL I want IN SHOWER AND LAVATORY to build a bulkhead entrance that leads to the basement. It will be in my.
Remove fixtures and cap all water and waste for the third-floor pantry and bathrooms.
$5KRemove fixtures and cap all water and waste for the third-floor pantry and bathrooms.
$5KPlumbing: rough-in and trim for a new pantry sink, dishwasher, coffee, point-of-use water heater, and leak detector.
$15KPlumbing rough-in and trim for 2 pantry sinks on the fourth floor. Operations Inc.
$10KPlumbing: rough and trim for pantry and bar sink on the fourth floor. “Binding Brauerei.”
$9.5KGas line for outdoor BBQ and pool heater.
$2KPlumbing for two apartments: (2) kitchens, bathrooms, and ejector pump.
$26KPlumbing for two apartments: (2) kitchens, bathrooms, and ejector pump.
$26KPlumbing rough-in and trim for 6 apartments.
$45KMechanical: gas piping to 6 furnaces and kitchen ranges.
$8.5KPlumbing - remove and repair sewer line in front yard of property into street.
$8KPlumbing - remove and repair sewer line in front yard of property into street.
$8KMechanical: 4 new gas meters with new service.
$2KPlumbing rough and trim for 3 apartments and 1 office space.
$60KGas pipe to generator. Receipt 19-1756 for $40 paid.
Gas pipe to generator. Receipt 19-1756 for $40 paid.
First floor: new water closet, tub, and sink; move clothes washer. Second floor: new water closet, shower, and sink. Underground gas piping for boiler to future generator.
Plumbing - 1 water closet, 1 shower, 1 lavatory - AFTER THE FACT.
$2KReroute storm drain piping on the ground floor; existing tie-ins and roof drains remain. West Lobby Renovation.
Third floor: 2 sinks and 1 dishwasher; rough-in and trim for 2 pantry sinks, 1 dishwasher, 3 coffeemakers, and 2 hot water heaters.
Plumbing - 5 new apts.
$30KPlumbing - 5 new apts.
$30KMechanical: 5 new gas services to apartments for furnace and range.
$10KBasement: 1 water closet, shower, sink. First floor: 1 water closet, sink.
After-the-fact permit for installed irrigation well equipment: well tank, Harmsco sediment filter, and backwashing filter, all for irrigation.