1312 Hope St
Stamford, CTPour three new footings and frame a new 6-by-18-foot deck with stairs, new stringers and risers, new posts, and handrails to code.
$4.1KLocal provider profile
Documented work across Connecticut based on attributed municipal records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Pour three new footings and frame a new 6-by-18-foot deck with stairs, new stringers and risers, new posts, and handrails to code.
$4.1KRemodel the basement bathroom.
$2.2KRemove two walls as per engineer plan. Remodel the exiting kitchen, and 2 bathrooms. Replace all existing windows with new vinyl windows uFactor 30. (To meet current codes with state amendments).
$23.5KFrame close opening under stairs and install door to make a closet and install fire rated drywall.
$2.1KReframe existing rotted wood in sunroom with new 2 x 4. Renovate first floor bathroom and second floor bathroom with existing layout. Close kitchen wall going into sunroom.
$9.5KReframe existing rotted wood in sunroom with new 2 x 4. Renovate first floor bathroom and second floor bathroom with existing layout. Close kitchen wall going into sunroom.
$9.5KReplace the existing roof on the house and garage with new asphalt shingles. 22 squares.
$8.3KReplace existing 23 windows with double-hung windows and 5 basement windows with a U-factor of. 30. Kitchen renovation. Replace damaged or broken sheetrock with 40 new sheets of drywall in the living room and upstairs bedrooms.
$16.8KDemo and remodel 2 bathrooms on second floor using same current layout. Install new vanities in both bathrooms, install new tile floor, install new shower tiles, WORK DESCRIPTION HAS BEEN AMENDED. Description as follows: "demo and remodel 2 bathrooms on second floor using same current layout. Install 2 new mixing valve, install new vanities in both bathrooms, install new tile floor, install new shower tiles, install new toilets, install new mirror and sconce lights, vent and install new vent in bed room bathroom". Project cost has increased $9900. Fee for additional $7900 will be added to review dashboard. (Noted 10/6/21: MK).
$2KDemolish and remodel the kitchen and bathroom using the same layout. Install a new bathroom vanity, new kitchen cabinets, new bathroom floor and shower tiles, and a new mirror. $4,700.
$4.7KWork in two upstairs bathrooms. In a small hall bathroom, replace 1 tub with a shower and replace the vanity and faucets (45 SF). In the second upstairs bathroom, update the shower with tile instead of a vinyl insert. Replace the bathroom vanity and broken faucets. Repair tile near the existing tub, or replace it if it cannot be repaired (95 SF). 7/1/21: Customer email added to the scope of work. The project will now include replacement of 2 upstairs toilets. The project cost will increase by $500. The email has been added to the attachments.
$14KDemo existing full bathroom. Install new tile and fixtures, keep existing layout.
$3.5KRemove 1 layer of asphalt shingles down to the sheathing. Install new #30 felt paper, new drip edge, new ice and water on all perimeter, architectural shingles on the roof, and new caps. 22 squares. Renovate 3 bathrooms and the kitchen, keeping existing layouts, with new. Trade permits required.
$18.7KDemolish and dispose of the existing bathroom. Install a new stand-up shower and all new fixtures.
$9KStrip and re roof.
$8.5KRemove and replace 1/2 roof on condo Unit 3B.
$4.2KInstall vinyl siding on a single-family residence.
$13.9KInstall new vinyl siding.
$13.8KStrip and re-roof a single-family residence.
$5.5KInstall new roofing and 2 skylights.
$5KRemove and re-roof; replace fascia boards and chimney flashing.
$16.4KBathroom remodel with new tile, toilet, mirror, and paint. Total permit amount to be determined upon issuance of the certificate of completion (code section 108.3, permit valuations). Payment adjusted 5-22-18.
$12.3KInterior renovation to add walls and construct a full bathroom.