Skip to content

Local provider profile

Fip Construction Inc.

Documented work across Connecticut based on attributed municipal records.

Reported work volume$15.6MDocumented jobs
Average project$2.2MWhere values are reported
First observed2021Available dataset
Categories3Observed work types
Used for work inNorwalk3 jobsStamford2 jobsTrumbull2 jobs

Contact information

Details found in public records

These details have not necessarily been claimed or independently confirmed by the provider.

No contact information was found in the available records.

Work history

Documented work by property

Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.

Satellite view of 32 Knight St, Norwalk, CTSatellite view
2025

32 Knight St

Norwalk, CT
  • 2025Build Tenant Comm

    Tenant fit-up for Hartford Healthcare.

    $5.5M
  • 2022Build Tenant Comm

    Tenant fit-up for a medical office – 18,704 square feet.

    $2.4M
Satellite view of 5520 Park Ave, Trumbull, CTSatellite view
2024

5520 Park Ave

Trumbull, CT
  • 2024Renovation

    120000new medical washer/dryer equipment. We are doing a kitchen renovation with new cabinets and appliances. We are.

    $6.6K
Satellite view of 950 High Ridge Rd, Stamford, CTSatellite view
2022

950 High Ridge Rd

Stamford, CT
  • 2022Demolition

    Complete fit-out of a suite for an urgent care facility, roof replacement, and parking lot grading. Phase 1: “Interior Demo” only. Plans submitted dated June 3rd for demo. MJS. June 7th, 2022.

    $2.5M
Satellite view of 260 Long Ridge Rd, Stamford, CTSatellite view
2021

260 Long Ridge Rd

Stamford, CT
  • 2021Demolition

    Fit out an existing shell space on the first level for a new cancer treatment outpatient clinic with new infusion bays. Work includes selective demolition, metal fabrications, roof patches, carpentry, millwork, doors, frames and hardware, interior glazing, automatic doors, window film, drywall, acoustical ceilings, tile, flooring, painting, wall protection, window treatments, plumbing, fire protection, heating, ventilation and air conditioning (HVAC), and electrical work. The 2-17-22 PCO is for the Smilow space, excluding the wet and dry lab area. SC3-11-22 includes the wet and dry lab and CRSL area. SC.

    $1.9M