21 Bayberry Hill Rd
Ridgefield, CT- 2026Solar
Install the following system parts provided by other1-40kWh Bess Battery system1-Automatic transfer switch1-Wattnode Power meter1-Bess E-stopSupply and install the following1-60-amp Critical Load Panel1-60-amp Load Panel Disconnect1-Tap existing service disconnect1-cat6 wire from existing access point in garage to battery system. 1-plywood PanelboardDescription of work. Install Bess battery system and all of it components to establish a emergency backup panel for essential loads. Run conduit along surface of garage to all components as necessary. Any sheetrock repairs by other. Relocate the following circuits into critical load panel. BathroomBedroomMicroUpper hallWellSepticNetworkPellet stoveGarage freezer.
$7.5K