4 6 2026 Ct
Trumbull, CTElectrical work Replace oil for interior fit-up in suite A300 for new dental office. Furnace with Propane high efficiency furnace. Replace air conditioning with new.
$104KLocal provider profile
Documented work across Connecticut based on attributed municipal records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Electrical work Replace oil for interior fit-up in suite A300 for new dental office. Furnace with Propane high efficiency furnace. Replace air conditioning with new.
$104KFire alarm Installing 1 SF of drainage work for Dental office fit-up in existing space. Plug-in dehumdifer, 437 SF of crawlseal, 1 crawlsapce door, 437 matting, 124 SF of extremebloc, and 437 SF of insulation.
$6.2KTelephone and data wiring for tenant fit-up on the first floor, “Silgan Holding.”
$42.8KTelephone and data wiring for tenant fit-up on the first floor, “Silgan Holding.”
$42.8KElectrical tenant fit-up for first-floor office space “Silgan Holding.”
$60KElectrical Work
Electrical Work
Demolition of 3 existing ATS switches.
$9.5KElectrical Work
ELE
Electrical wiring per plans and specifications for lighting, exit signs, emergency lighting, outlets, panel, transformer, and fire alarm devices, as shown.
$41.6KInterior office fit-up of existing space: 2 switches, 12 outlets, and 11 light fixtures.
64 devices installed. Replace existing lighting with new LED fixtures. Replace existing switches with occupancy sensors. Furnish and install 9 new outlets.
$22KFurnish and install 400-amp underground temp service for construction power.
$5.6K7 devices installed; electrical work. Demolition of the building interior; furnish and install temporary lighting and outlets.
Electrical - interior ofc. Renovations - fourth floor - "Binding Brauerei" - includes lighting, switches, controls, outlets, HVAC equipment, panel and fire alarm.
$82.9KElectrical - interior ofc. Renovations - fourth floor - "Binding Brauerei" - includes lighting, switches, controls, outlets, HVAC equipment, panel and fire alarm.
$82.9KElectrical work: demolition of interior space and temporary lighting in a fifth-floor office.
$14.1KElectrical work on the 5th floor. Perkins Eastman.
$115KElectrical wiring per plans and specifications, including fire alarm, on the fifth floor. “Heidmar.”
$138KElectrical interior renovations in the existing space, “Auora Cafe Shop.”
$70.9KElectrical interior renovations in the existing space, “Auora Cafe Shop.”
$70.9KElectrical work for tenant “F45 Fitness Club.”
$84.5K20 devices installed; interior renovation of the existing elevator lobby, Terrace Level C.
20 devices installed; interior renovation of the existing elevator lobby, Terrace Level C.
72 devices installed: lighting, switches, exit signs, emergency lights, outlets, and fire alarm devices.
Electrical wiring per plans for lighting, outlets, and equipment at “Sequel” on the first and second floors.
$39KElectrical interior office fit-up, including fire alarm, for Marsh & McLennan — fourth floor.
$15KElectrical interior office fit-up, including fire alarm, for Marsh & McLennan — fourth floor.
$15KElectrical work for the interior tenant on the first floor, west: “Pay Chex.” Includes fire alarm.
$98.5KElectrical: Demolish to the core and install temporary lighting.
$38KElectrical interior alterations for office fit-up, “New Star Financial.”
$59KElectrical: telephone and data wiring to tenant, “New Star Financial.”
$9K567 devices installed; 1: rng., oven, 2: clthsdryrs., oil burner motor, 4 air conditioning motors, 4 pool equipment, 3: dshwshrs. 800-amp service; line and low voltage wiring for new house, includ. Outlets, switches, lighting, mech. Equipment wiring, Lutron system, a/v wiring, appliance connections, electrical. Service, underground conduits etc.
567 devices installed; 1: rng., oven, 2: clthsdryrs., oil burner motor, 4 air conditioning motors, 4 pool equipment, 3: dshwshrs. 800-amp service; line and low voltage wiring for new house, includ. Outlets, switches, lighting, mech. Equipment wiring, Lutron system, a/v wiring, appliance connections, electrical. Service, underground conduits etc.
Underground conduit for poolhouse. Amendment (1/4/19): 20 devices installed; 4 for pool equipment; subpanel, lighting, outlets, and power for pool equipment.
44 devices installed. Lighting, exit sign, switches, outlets, overfloor raceway, and trading desk relocation as shown; selected electrical demolition included. Data wiring included for 44 new CATSe and 24 relocated existing.
16 devices installed; interior electrical. Demolition, reduce to core, and install temporary lighting.
17 devices installed; select electrical. Demolition; relocate 5 existing fixtures, 6 switches, 3 outlets, 2 date stubs, and 1 existing horn/strobe.
8 devices installed; separate lighting and add 2 new switches at new interior demising wall.