2020New Construction
Construction of an accessory 3-car garage with a storage room in the rear. State education fee paid: $70.20. Electrical: Wire the detached garage as per print, with outlets, GFI, switches, and lighting; install a new 100-amp subpanel; wire for 3 garage door openers, 1 air handlers, and 1 outdoor air conditioning condenser. 4 switches, 15 outlets, and 17 light fixtures. Existing 600-amp service.
$270K2020Electrical
Add a 2-car garage to the existing dwelling. State education fee paid: $71.76. Amendment #1, 3.8.21: Valuation $118,000; fee $1,604.68. Convert the attached 3-car garage to a bedroom, bathroom, and closet; convert a bedroom to an office; bathroom; bath removed to closet. Plumbing: First floor: 1 sink, 2 floor drains, hose bibs. Install 2 floor drains in the garage. Electrical: Wire the attached garage as per print with outlets, GFI, switches, and lighting; install a new 200-amp subpanel; wire for 2 car chargers; also wire 1 Modine heater.
$276K2020Mechanical
Construction of a new accessory pool house with a full bathroom. State education fee paid: $47.84. HVAC: Installation of a 1000 gallon underground propane tank and gas piping from the propane tank to an existing pool heater.
2020Mechanical
Construction of accessory 3 car garage with storage room in rear. State Ed Fee Paid $70.20 Amend 1: add basement beneath rear strorage area, add bilco door. Value: $19,600 permit: $260 educ.$5.20 rec. 20-1113 electrical: wire detached garage as per print, with outlets, GFI, switches, lighting; install new 100-amp subpanel, wire for 3 garage door openers, also wire 1 air handlers nad 1 outdoor air conditioning condenser; 4 switches, 15 outlets, and 17 light fixtures. Existing 600-amp service.
2020New Construction
Construction of a new accessory pool house with a full bathroom. State education fee paid: $47.84. Plumbing, First floor: 1 water closet, basin, clothes washer, and 2 hose bibs. Electrical: Wire the pool house as per print, with outlets, GFI, switches, and lighting; install a new 100-amp subpanel; wire for a washer and dryer; also wire 1 a/r handler and 1 outdoor air conditioning condenser; wire for an electric hot water heater and 1 sewage ejector.
$184K