39 N Water St
Greenwich, CTReplace grease trap. Receipt 20-0413 for $40 paid.
$1KLocal provider profile
Documented work across Connecticut based on attributed municipal records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Replace grease trap. Receipt 20-0413 for $40 paid.
$1KFirst floor: 2 water closets, tubs, basins, 1 shower, sink, and dishwasher; replace kitchen sink; renovate 2 bathrooms.
Install gas line for propane tank to stove (rear of house). New gas line for stove in kitchen (propane). Rear of house. Amendment (7/28/20): New gas line for stove in kitchen (propane).
First floor: new kitchen sink.
First floor: 2 new water closets and basins, and 1 new shower; Second floor: 2 new water closets and basins, and 1 new tub and shower.
Second floor: 1 new water closet, shower, and 2 new basins; install new bathroom.
Second floor: 1 water closet, tub, shower, and 2 sinks. Master bath update; replace shower, tub, and sinks.
First floor: 1 new sink and dishwasher. Second floor: 1 new water closet; replace 2 water closets; 1 new tub; 2 new basins; replace 2 basins; 1 new shower. Relocate gas line for stove.
Gas line to generator. Receipt for $40 paid.
First floor: move: water closet, shower, sink, replace: laundry tub.
Second floor: 2 basins, water closets, and 1 tub.
Basement: 1 basin, shower.
First floor: 4 new water closets, basins, 3 new showers, 2 new sinks, 1 new clothes washer, and dishwasher; Second floor: 1 new water closet, tub, shower, clothes washer, and 2 new basins. First floor: replace 1 gas range.
First floor: 4 new water closets, basins, 3 new showers, 2 new sinks, 1 new clothes washer, and dishwasher; Second floor: 1 new water closet, tub, shower, clothes washer, and 2 new basins. First floor: replace 1 gas range.
Gas pipe to generator. Receipt for $40 paid.
First floor: sink and dishwasher; repipe kitchen and move gas stove; repipe waste and vent in walls of kitchen to second floor. Bathroom.
Second floor: 1 nw: sink with hartel pump and emax hot water, waterheater for offc.
First floor: 4 water closets, 4 basins, and 2 urinals. Second floor: 5 water closets, 4 basins, and 2 urinals.
Second floor: replace 1 water closet, tub, basin, and shower.
First floor: 1 water closet, shower, sink, laundry tub, and urinal.
First floor: replace 1 water closet, tub, basin, sink, and dishwasher. Second floor: replace 1 water closet and basin; 1 new shower.
Demolition of plumbing fixtures only.
First floor: 1 new water closet, basin, and sink; also one EMAC water heater under the sink.
Basement: 3 new sinks, floor drains, and 2 new hose bibs. First floor: 2 new water closets, basins, 4 new sinks, 3 new hose bibs, 4 new floor drains, 1 new urinal, and a dishwasher. Second floor: 1 new water closet, basin, shower, sink, 2 gas fryers, 1 gas oven, 1 cooktop (propane), and an outside grease trap.
First floor: 2 new sinks and 1 dishwasher; also connect the ice maker and gas stove (reconnect).
Second floor: 2 new water closets, tubs, 3 new basins, and 1 new shower. Install piping for double vanity, toilet, shower, and free-standing tub. Amendment (5/2/18): First floor: 1 sink and dishwasher.
First floor: 1 new sink and dishwasher. Second floor: 2 new water closets, 1 new tub and basin, and replacement of 1 basin. Gas piping for water heater, stove, and 2 a/r handlers.
Second floor: replace 1 water closet; install 1 new shower and 2 new basins.
Install gas line for generator.
$10KThird floor: 1 new sink; add electrical work, a water heater on the third floor, and a pump under the sink.
Building. C - 3 units: basement: 3 water closets, s, basins, showers, 2: launtbs., clthswshrs.; First floor: 2; water closets, 3 basins, 1 tub, shower, sink, dishwasher; Second floor: 2 nw: water closets, basins, 2 dshwshrs., 3 sinks, 1 laundry tub, clothes washer; Third floor: 4 water closets, showers, 6 basins, 2 tubs., roof level: 2 sinks, 4 hose bibs first floor also gets: 1 gas stove, 2 gas fireplaces, 1 gas grill, 1 barsnk, 1 outdoor sink, 1 icemaker; Second floor: also gets: 2: gas fireplaces, 2 gas stoves, 2 ice makers, 1 bar sink, 1 outdoor grill, 1 outdoor sink; Third floor: 1 fireplace, 2 grills, 2 fireplaces, roof.
Install gas piping to 2 gas-fired furnaces on ground floor. Amendment (3/10/16): First floor: 1 water closet, basin (to add half bathroom on ground/first floor. Amendment (6/25/18): First floor: 1 nw: water closet, basin, sink; install 1 water htr.; Unit #1: 1: toilet, 1 pantry sink 1 Emax, 1 lavatory.
Install gas piping to 2 gas-fired furnaces on ground floor. Amendment (3/10/16): First floor: 1 water closet, basin (to add half bathroom on ground/first floor. Amendment (6/25/18): First floor: 1 nw: water closet, basin, sink; install 1 water htr.; Unit #1: 1: toilet, 1 pantry sink 1 Emax, 1 lavatory.
Third floor: 2 new water closets, basins, 1 new clothes washer, and 7 new sinks; also install 6 ACP pumps under exam sinks and 1 30-gallon electric water heater.