2024
34 Midrocks Dr
Norwalk, CT- 2024Plu Alt Comm
Install 2 new heads, raise 2 heads, lower 2 heads, relocate 5 heads approximately 1 ft.
$2K
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
No contact information was found in the available records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Install 2 new heads, raise 2 heads, lower 2 heads, relocate 5 heads approximately 1 ft.
$2KInstall sprinkler to attic space.
$30KInstall a new sprinkler system.
$22KFirst floor: Lower 8 pendant heads to the new reflected ceiling; install z dry heads in freezers.