Drains, and Remove of Timberline new drip edge synthetic 2 hand sinks and ice cream sink, gas piping for 2 RTU's 22 sq of old roof shingle. Install 22 sq of new roof shingle, GAF Architect (50 years warranty) Install 6 feet of ice water. Install around the house. Install seam tape at the wood joints. Install felt paper. Install 1 new pipe boots 2†and 4†Install 65 feet of.
Modify existing bath remodel: tub/shower waste, vent, and domestic water per plans. Completely gut the second-floor hall bathroom. Remove the jetted unit, toilet, and cabinets. Install a new tiled shower. Install new.
For two 2 RTU's The front steps wide maintence concrete footing in house porch and the porch needs to be replaced as a part of the community done by HoA. But as per the code mandated by the town, there has to be a on which the steps has to be placed. Currently there is no concrete footing.