Skip to content

Local provider profile

George Mulvaney

Documented work across Connecticut based on attributed municipal records.

Jobs on record10Recorded in our system
Reported work volume$2.1MDocumented jobs
Average project$265KWhere values are reported
First observed2018Available dataset
Categories3Observed work types
Used for work inWilton7 jobsGreenwich2 jobsNorwalk1 jobs

Enriched provider details

Provider information

Supplemental data supplied by FullContact and stored separately from public records.

FullContact query stored 2026.

Work history

Documented work by property

Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.

Aerial image of 77 Danbury Rd, Wilton, CT

77 Danbury Rd

Wilton, CT7 jobs on record
2026Plumbing

Plumbing/Gas Permit

$39.2K
View all 7 jobs
  • 2026Plumbing

    Plumbing/Gas Permit

    $39.2K
  • 2026Plumbing

    Plumbing/Gas Permit

    $93.8K
  • 2026Plumbing

    Plumbing/Gas Permit

    $111K
  • 2026Plumbing

    Plumbing/Gas Permit

    $312K
  • 2026Mechanical

    HVAC, Geothermal, Chimney liners & Oil Tank Permit WILTON

    $103K
  • 2026Mechanical

    HVAC, Geothermal, Chimney liners & Oil Tank Permit WILTON

    $1.3M
  • 2026Plumbing

    Plumbing/Gas Permit

    $31.2K
Aerial image of 40 Highland Ave, Norwalk, CT

40 Highland Ave

Norwalk, CT
2022Mech Alt Comm

Replace the existing cooling tower with a BAC model closed-circuit cooling tower.

$108K
Aerial image of 10 Hillside Rd, Greenwich, CT

10 Hillside Rd

Greenwich, CT2 jobs on record
2018Mechanical

HVAC unit and associated ductwork for the renovated Boys and Girls locker room.

View all 2 jobs
  • 2018Mechanical

    HVAC unit and associated ductwork for the renovated Boys and Girls locker room.

  • 2018Plumbing

    Boys’ and girls’ bathrooms and locker room. First floor: replace 5 water closets; 1 new water closet; 6 new basins; 4 new showers; replace 4 showers; replace 5 sinks; replace 2 urinals; 2 new floor drains; hose bibs. 1 hot water heat exchanger replacement on roof mechanical room.