2026Roofing
Grateful Heights Roofing will work only on the back section of the home, removing the existing 1-layer (1860 SF, approximately 19 SQ) from the upper main roof and front overhang down to the existing plywood decking. Install 2 courses (6') of ice and water barrier on all eaves. Install plywood/deck tape on all plywood not covered with ice and water, as well as TopShield synthetic underlayment. Install new flashing, including F8" drip edge and C4.5" rake edge. Install IKO Dynasty shingles and ridge cap, with 6 nails per full-length shingle. Ventilation: Existing ventilation consists of X2 24"W x 32"H gable vents, as well as center-vented soffit that vents straight through, providing 7-8 sq/in per 1/linear ft and running the length of both eaves, providing (x100') 700-800 sq/in of intake ventilation. To correct the ventilation, close both gable vents from the interior with 1/2" CDX plywood, cut ridge ventilation (1 1/2" from both sides of the ridge beam), and install 46' of Owens Corning Ventsure PVC ridge vent, providing 18-20 sq/in per 1/linear ft and 828-920 sq/in of exhaust ventilation. Building dimensions: 49'x30'. NFVA: 1470 sq/Ft. (1/150) = 9.8 SQ/FT (1,411 sq/in) minimum intake/exhaust vent needed. New system providing 1,528-1720 sq/in.
$12.3K