Remove and dispose of existing indoor and outdoor air conditioning equipment. Install a new Trane air handler in the attic and connect it to the existing supply and return ductwork. Install a new Trane condenser. Install a new 220v circuit from the mechanical room to the air handler.
Remove and dispose of the existing oil furnace and air conditioning system. Install a new oil furnace with an evaporator coil and connect it to the existing supply and return ductwork. Install a new flue pipe to the existing chimney. Install a new heat pump on a plastic level pad.
Install one Daikin 15k BTU floor-mounted indoor unit in the upper-level foyer/office area. Install a Daikin 12k BTU wall unit on the lower-level living room wall and one 9k BTU wall unit in the primary bedroom. Install a Daikin 36k BTU outdoor heat pump on a riser pad. Install 2 Daikin 12k BTU floor-mounted indoor units in the living and dining rooms. Install a Daikin 24k outdoor heat pump on a riser pad. Install a new Trane air handler in the loft area above the bedrooms, with supply and return ductwork to condition the second-floor bedrooms and lower-level living room. Install an outdoor Trane heat pump on a level riser pad outside.
Install two Fujitsu wall units on the exterior living room wall to condition the lower level of both apartments. Install four Fujitsu wall units in the upper-level bedrooms of both apartments. Install two Fujitsu outdoor heat pumps on the gable side of the home.
Install one Fujitsu wall unit on the exterior living room wall facing the dining and kitchen area. Install one Fujitsu wall unit in each of the three bedrooms. Install a Fujitsu outdoor heat pump on a riser pad under the deck of the home.
Remove and dispose of two first-floor hydro air handlers and AC condensers. Install a new 4-ton Bosch air handler with two zone controls and connect it to the existing supply and return ductwork. Install a Bosch outdoor heat pump on a riser pad.
$18K
2026Mechanical
Remove and dispose of the existing oil boiler. Install a new IBC condensing propane gas boiler and connect it to the existing supply and return piping. Install gas piping from the boiler to the existing basement gas manifold.
Install a Fujitsu 18k outdoor heat pump on a plastic pad with a riser at the back of the home. Install 2 Fujitsu 9k indoor wall units in second-floor bedrooms. Install a new Bosch air handler in the basement with ductwork to condition the first floor. Install a Bosch outdoor heat pump on a plastic pad at the back of the home.
Remove and dispose of the existing oil furnace and air conditioning system. Install one new Thermopride low-boy oil furnace with a new Bosch cased evaporator coil. Install a new oil burner. Connect to existing ductwork, oil line, and electrical. Install a new Bosch outdoor heat pump on a level riser pad.
Remove existing First Company air handlers and install 2 new Trane air handlers with hydronic heating coils, connected to the existing supply and return ductwork. Install 2 new Trane heat pumps on plastic riser pads. Connect the existing boiler heat pipes to the new hydronic heating coils on both air handlers. Upgrade electrical work to both air handlers. Install electrical to both outdoor heat pumps.
Install one Fujitsu 18k BTU high-wall unit on the exterior dining room wall facing the living room. Install one 12k BTU high-wall unit in the upper-level bedroom and one 7k BTU high-wall unit in the lower-level guest room. Install a Fujitsu 36k BTU outdoor unit on a riser pad.
Install one new Bosch heat pump to condition second floor. Install one new Bosch air handler. Install new supply duct work with one register in each room and one return in hallway. Install Bosch heat pump on pad outside. Install one new Fujitsu 24k wall unit and one new outdoor Fujitsu 24k heat pump.
Install a new Trane heat pump system to condition the upper floor of the home. Install a Trane air handler and new supply ductwork for each room. Install one supply register through the closet to the finished basement area. Install the Trane heat pump on a level pad outside.
Remove the existing ductless system. Install a new Fujitsu high-wall indoor unit in the existing location. Install a new Fujitsu heat pump on a level riser pad outside.
Remove the existing Bock oil water heater and install a new propane power-vented water heater. Connect it to the existing domestic water pipes and gas piping.