235 Main Ave
Norwalk, CTInterior renovation to the existing “Walgreens” — two clinic exam rooms and a bathroom.
$294KLocal provider profile
Documented work across Connecticut based on attributed municipal records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Interior renovation to the existing “Walgreens” — two clinic exam rooms and a bathroom.
$294KInterior remodel work only. New tenant improvements for skin care professional services, including: 1. New non-load-bearing partitions, doors, ceiling, and lighting. 2. New HVAC equipment; refer to mechanical drawings for more information. 3. New electrical throughout, new power/data outlets, and new lighting; refer to electrical drawings for more information. 4. New plumbing, including a lavatory, water closet, mop sink, and drinking fountain; refer to plumbing drawings for more information.
$281KInterior fit-out of retail space for "LensCrafters".
$350KTenant: Warby Parker/Jand, Inc. Tenant improvements. State education fee of $16.90 paid 5/27/19. Change of contractor: $40. Amendment #1: 7.9.19, fee $40 at A. 1.1. Walls type 3 and 4. Amendment #2: 7.9.19, value $15,000, fee $268.90. Storefront modifications.
$65KLessee: Warby Parker Tenant improvement : Interior alteration. To include new fixtures, furnishing, mechanical: electrical. And plumbing. State Ed. Fee paid.: $20.28 Amend#1:4/25/18 Exterior Store Front $4725 Fee$116.30 Amend #2: 5.23.18 fee $60 revision to HVAC distribution; ceiling heights; addition of soffits for HVAC and associated updates to lighting layout Amend #3: 6.28.18 fee $100 basement level is no longer part of t he lease, therefore, it has been removed from drawings.
$78K