Skip to content

Local provider profile

HSL Building Company LLC

Documented work across Connecticut based on attributed municipal records.

Reported work volume$2.4MDocumented jobs
Average project$483KWhere values are reported
First observed2018Available dataset
Categories3Observed work types
Used for work inGreenwich2 jobsNorwalk2 jobsWeston2 jobs

Contact information

Details found in public records

These details have not necessarily been claimed or independently confirmed by the provider.

Phone
(203)515-8051source record
Email
[email protected]source record

Work history

Documented work by property

Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.

Satellite view of 5 Myrtle St, Norwalk, CTSatellite view
2024

5 Myrtle St

Norwalk, CT
  • 2024Renovation

    Convert existing commercial office space to 2FR.

    $50K
  • 2024Renovation

    Construct 22'x25' detached 2 car garage.

    $30K
Satellite view of 96 Norfield Rd, Weston, CTSatellite view
2023

96 Norfield Rd

Weston, CT
  • 2023Addition

    Addition of 300 square feet for 2 bedrooms, 3 bathrooms, and a breakfast room. To meet current codes; subcontractors to apply for required permits.

    $1.4M
Satellite view of 95 Kettle Creek Rd, Weston, CTSatellite view
2020

95 Kettle Creek Rd

Weston, CT
  • 2020Renovation

    Adding shower in basement and full bathroom over garage (work already done).

    $35K
Satellite view of 33 Byram Dr, Greenwich, CTSatellite view
2018

33 Byram Dr

Greenwich, CT
  • 2018Renovation

    Additions and alterations State Ed. Fee paid.: $234.00 HVAC: remove existing steam boiler and install 2 boilers with 80 gallon. Indirect hot water heater; remove existing hydronic boiler and install 5 existing hydronic zones on new boilers electrical: run new homeruns, install outlets, switches, fixtures to appliance connections; wire for heat/air conditioning, data and television electrical (2): add fire and co dets.; rewire some windows and doors, install burglary and fire alarm systems HVAC (2): modify 2 existing first floor. Duct systems from existing air handlers to provide heat to renovated spaces; install new zone systems for 2 first floor. Systems instal 2 new steam humidifiers for first floor systems PLUMB: first floor: replace 2: sinks, move 1 sink replace 1; dishwasher; Second floor: replace 2: water closets sinks and 1:, tub, shower, basin, shower; install shower valve and shower pan; install new kitchen sink, hookup gas stove.

    $900K