Patching in the elevator machine room, hoistway, and pit to maintain the fire rating. Installation of elevator machine room signage per code. Adjustment of the elevator machine room door to make it self-closing per code. Removal, patching, and painting of the existing louver in the machine room. Removal, preparation, and installation of new elevator cab flooring.
Yerwood Center renovations. Construction of classrooms and accessory rooms on the first and second floors. Install a new limited-use lift connecting all floors. The total work area is 17,359 SF.
This project involves an elevator addition, including site work, demolition, concrete, masonry, structural steel, rough carpentry, waterproofing, roofing, storefronts, and curtain walls.
Replace old fuel tanks with new ones and add a fueling island. Includes interior modifications to the vestibule, bathroom, office, and money room. E20-0824-Ele Alt Comm: Outside wire fuel tanks and fuel island equipment. E20-0838-Ele Alt Comm: Install underground conduit and wire to fuel tanks and overhead lube consisting of power and low voltage. P20-0416-Plu Alt Comm: Install new sprinkler branch line with heads. P20-0417-Plu Alt Comm: Remove and install new underground sanitary, including demolition and new rough-in/finish of one single toilet room (water closet and lavatory). Install new sprinkler branch line with heads. H20-0752-Mech Alt Comm: Exhaust fan and finned tube radiation work. P20-0418-Plu Alt Comm: Install new aboveground diesel tanks, dispensers, underground fuel piping, and piping for engine oil, compressed air, automatic transmission fluid, and tanks for listed lube products. P20-0465-Plu Alt Comm: Install fuel island fire suppression system at gas canopy.
Repair and rebuild the foundation and framed structure on the northeast corner of the existing building only, per the unsafe structure letter. “Moose Lodge.”
$24K
2018Addition
Renovs. To exist. "Moose House" - mixed use - office/residential - bsmt is 5 office spaces and rec space - first floor is 2 apts. And retail - second floor office with 2 full bath - 2 sty. Rear addition 7-by-15-foot for stairwell.
Installing 1 new elevator. Elevator #2 only. The structure has sustained structural damage and has been posted as an unsafe structure. Permit application marked inactive until structural issues are resolved.
Renovs. To exist. 4 sty. Mixed use building. Bsmt. Storage - first floor 3 retail, 2 office spaces - second floor meeting sp and office - third floor -3 units and office space - fourth floor, 1 unit and offices and new elevator.