JM Roofing will remove all existing siding material attached to the decking surface and haul it away into a job site container. Replacement of following flashing materials: dryer- vents, Electrical blocks, and Water accesses. Installation of one layer of #house wrap. (Moisture barrier). Install 6" flashing tape around windows and door before trim installation. Install on all Windows 5/4†X 4†white P. VC. Trim boards, Install on all Doors and corner boards a 5/4†X 6†White PVC Trim boards. Install on Fascia, rake, and soffits board a 1†X 6†white PVC Trim boards. Install white PVC 5/4" X 6" corner boards. Gable to have a new 12†X 18†White PVC Gable Vents. (No necessary). Install new Fiber Cement, Hardie Plank-Lap Siding, 7-inch exposure to the weather (JamesHardie), gaps will be sealed with James Hardie caulk, Color: Homeowner’s preference. Install custom aluminum capillary break on roof to sidewall. Install a strip of white 2†metal vent on soffit. Install custom 5/4†X5/4†PVC inside corner posts. Remove existing gutters and replace with new Black Aluminum 5†K-style gutters with gutter guards and all accessories. Install Foam Board underneath the HardiePlank to uneven areas of the home. (Only where needed)JM will allocate a Portable Toilet on-site for crew-workers for this ProjectJM will make every attempt to protect the windows, doorways, porches, decks, patios, and surrounding grounds, bushes, shrubs, with tarps and/or plywood. The homeowner is asked to supply electrical power; it will be necessary to have access to an external electrical power source.
Re-side the existing 25-by-13-foot porch with Hardi plank siding. Remove the existing siding and install new Tyvek. Remove four existing single-pane windows and reframe. No changes to the existing footprint.
Remove the existing roof material, flashing, and any membranes attached to the decking surface. Install new "GAF LIFETIME HDZ" shingles, secured with six 1 1/4" galvanized roofing nails. Remove existing skylights and replace them with 7 new fixed and 2 new vented Velux skylights.
Remove existing roof materials, including asphalt shingles, flashing, and any membranes. Remove and replace the chimney flashing with copper flashing, and seal the masonry with silicone.
Remove the existing roof material, flashing and any membranes attached to the decking surface to haul away in a job site container. Full Ice and Water membrane protection will be installed on the valleys, Edges, and around any roof penetrations. Full Two courses of Ice and Water membrane protection above the gutters. (72")Remove existing drip edge and replace with new F-5 aluminum drip edge. Install new Rhino synthetic roof paper where Ice and Water membrane is not installed. Apply MFM Roof Deck Tape on all joints and seams of the exposed decking surface (Plywood) where Ice and water Membrane is not applied. Install GAF WeatherBlocker along the edges of the roof before shingles application. All pipe vents shall be flashed with new boot flashings with neoprene gaskets sized to the pipe diameters. Install new "GAF LIFETIME HDZ" shingles, secured with six 1 1/4" galvanized roofing nails. Install new "Cobra" Air vent, this provides one SF of net free ventilation for every three hundred SF for attic floor space. Install a precut shingles caps TimberTEX with a 2 1/2" galvanized nails. JM Roofing and Siding will make every attempt to protect the windows, doorways, porches, decks, patios, and surrounding grounds, bushes, shrubs, etc. Homeowner is asked to supply electrical power. It will be necessary to have access to an external electrical power source.
1. Remove the existing roof material, flashing, and any membranes attached to the decking surface, and haul them away in a job-site container. 2. Remove the existing chimney flashing and install new copper chimney flashing, sealed into the masonry with transparent silicone. Replace step flashing if required. 3. Install full ice and water membrane protection on the valleys, rear dormer, and along the edges of the roof deck surfaces. 4. Apply MFM Roof Deck Tape to all joints and seams of the exposed decking surface where ice and water membrane is not applied. 5. Install new Rhino synthetic roof paper where ice and water membrane is not installed. 6. Flash all pipe vents with new boot flashings with neoprene gaskets sized to the pipe diameters. 7. Install new GAF LIFETIME HD shingles, secured with six 1 1/4-inch galvanized roofing nails. 8. Install a new Cobra air vent, providing one SF of net-free ventilation for every three hundred SF of attic floor space. 9. Install precut shingle caps with 2 1/2-inch galvanized nails. 10. JM Roofing and Siding will make every attempt to protect the windows, doorways, porches, decks, patios, and surrounding grounds, bushes, shrubs, and other vegetation. 11. The homeowner is asked to supply electrical power. Access to an external electrical power source will be necessary.