Skip to content

Local provider profile

Jacob Hazen

Documented work across Connecticut based on attributed municipal records.

Jobs on record6Recorded in our system
Reported work volume$173KDocumented jobs
Average project$28.8KWhere values are reported
First observed2023Available dataset
Categories1Observed work types
Used for work inStamford6 jobs

Work history

Documented work by property

Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.

Aerial image of 32 Strawberry Hill Ct, Stamford, CT

32 Strawberry Hill Ct

Stamford, CT4 jobs on record
2026Building Permit

Install temporary tents and flooring. The tents will be walled, heated, and have Lighting: 1 at 80' x 140' (11,200); 2 at 25' x 45' (2,250); 1 at 25' x 35' (876); 1 at 16' x 24' (384); 1 at 10' x 40' (400); 1 at 9' x 55' (495); 1 at 9' x 45' (405); 2 at 6' x 30' (360); and 1 at 9' x 8' (72). Three above marquess will be installed on the day of the event and broken down immediately after the event. They will be installed on the driveway in front of the hospital's CyberKnife area, connecting the hospital to the main tent. Install Jersey barriers to block the entrance from the street. Installation date: 10/04-06/26. Takedown: 10/08/26-MK.

$45K
View all 4 jobs
  • 2026Building Permit

    Install temporary tents and flooring. The tents will be walled, heated, and have Lighting: 1 at 80' x 140' (11,200); 2 at 25' x 45' (2,250); 1 at 25' x 35' (876); 1 at 16' x 24' (384); 1 at 10' x 40' (400); 1 at 9' x 55' (495); 1 at 9' x 45' (405); 2 at 6' x 30' (360); and 1 at 9' x 8' (72). Three above marquess will be installed on the day of the event and broken down immediately after the event. They will be installed on the driveway in front of the hospital's CyberKnife area, connecting the hospital to the main tent. Install Jersey barriers to block the entrance from the street. Installation date: 10/04-06/26. Takedown: 10/08/26-MK.

    $45K
  • 2025Building Permit

    Installing temporary tents and flooring. Tents will be walled, heated, and have lighting.

    $40K
  • 2024Building Permit

    Installing temporary tents and flooring. Tents will be walled, heated, and have lighting.

    $40K
  • 2023Building Permit

    Install temporary tents and flooring. The tents will be walled, heated, and lighted: 1 tent, 80' x 160' (12,800); 2 tents, 25' x 45' (2,250); 1 tent, 25' x 35' (876); 1 tent, 16' x 24' (384); 1 tent, 10' x 40' (400); 1 tent, 9' x 55' (495); 1 tent, 9' x 45' (405); 2 tents, 6' x 30' (360); and 1 tent, 9' x 8' (72). Three above marquess will be installed on the day of the event and broken down immediately after the event. They will be installed on the driveway in front of the hospital's CyberKnife area, connecting the hospital to the main tent. Jersey barriers will also be installed to block the entrance from the street.

    $33.4K
Aerial image of 770 Pacific St, Stamford, CT

770 Pacific St

Stamford, CT
2026Building Permit

50' x 100' party tent for 1 day of use. Event to take place 4/24/2026; tent will be removed the following day, 4/25/2026.

$7K
Aerial image of 97 Ocean Dr W, Stamford, CT

97 Ocean Dr W

Stamford, CT
2023Building Permit

Install a 60' x 110' century tent and two entrance marquees (6-by-20-foot and 6' x 35') on the back lawn.

$7.4K