277 Main Ave
Norwalk, CT- 2025Renovation
Tenant expansion for "Croce's Transmission": creation of an 18' wide auto ramp to the rear section of the building for service bay renovation and existing bathroom.
$134K
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Tenant expansion for "Croce's Transmission": creation of an 18' wide auto ramp to the rear section of the building for service bay renovation and existing bathroom.
$134KInterior fitup with concrete slab at rear.
$125KRenovations to Weston Market. 1) To meet current codes with state amendments. 2) Sub-contractors to apply for required permits.
$425KRemove and replace the loading dock concrete slab and the damaged top section of the concrete foundation wall.
$25KAdding a classroom (training) element to existing space.
$120KTenant fit-up for “Primotec”: new interior layout for offices and manufacturing conference from reconfiguring existing bathrooms.
$200KTenant fit-out–first floor. Trade permits required.
$15KReplacement tenant: "DIane James Design."
$45KTenant – second floor – medical office – “Dr. Patel” – “Arch Foot Care.”
$90KRelocate the handicap ramp and door for a future building.
$30K