66 Butternut Hollow Rd
Greenwich, CT- 2026Mechanical
HVAC Work
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
HVAC Work
HVAC Work
$6.4KHVAC Work
HVAC Work
Install a 3 ton Bosch heat pump system.
$6KHVAC Work
High eff boiler install for heating and domestic water heater - 190,000 VTU combi boiler.
$5KInstall 2-ton AC system and 90,000 BTU combi gas fired boiler.
$7KHVAC Work
HVAC Work
HVAC Work
$8KHVAC Work
HVAC
HVAC
HVAC
HVAC Work
HVAC Work
HVAC Work
HVAC
Install 2 hard, 1 condenser ductless heat pump, 1 1/2-ton, to the garage and apartment above the garage.
Mechanical: Install 3-zone Hydro Air heating and cooling systems: (1) 2-zone AC handler for the second and third floors and (1) 2-tone air handler for the first floor.
$5KInstall 4 zone hydro air heating and cooling system; 1 4-ton system, 2 aone on second floor.; add 1 3 1/2-ton 2 zone system on first floor.
Install 7 zone hydro-air heating and cooling system: 2 3-ton air handlers in attic, and 2 air handlers in basement (one 3 1/2-ton, one 2 1/2-ton); also includes installing a 280000 btu gas-fired hi-eff boiler.
Install 4 zone hot air heating and cooling system. 1 60000 btu gas-fired furnace in attic and 1 60000 btu furnace in basement. No air conditioning units.
2015IRC/2018 CT AMEND Construct Inground Swimming Pool, Spa and Required Safety Barrier. Fencing/safety devices must comply with State Building Code PER SECT. AG 106.1 CSBC and Sect. 4.3, apsp-7, any pool, spa, or hot tub with a broken, loose or missing suction outlet cover shall be immediately placed out of service until repairs or replacement is completed with an approved outlet cover. State ed fee paid $18.20 electrical: wire pool and associated equipment at pool pad as per code and plans. 3 pool equipment PLUMB: connect gas line to new pool htr.
$70KExtend ductwork into the second floor. Addition from the existing system; install a hydro heating coil into the existing second-floor system. No condenser is being installed.
Install a 60,000 Btu high-efficiency furnace and 2 1/2-ton cooling system in the upper apartment, and replace the ductless cooling system in the restaurant on the first floor.
Replace existing ductwork in the attic to allow for finished attic space. Amendment (11/25/20): Install a 4-zone hydro-air heating and cooling system; 1 4-ton system with 2 zones on the second floor; add 1 3 1/2-ton, 2-zone system on the first floor.
Install 4 zone hot-air heating and cooling system; 1 60000 btu fulrnace for second floor. And 1 60000 btu furnace for first floor.
Clean ducts and replace duct insulation where needed.
Remove existing ductwork from the space and install new exposed ductwork for the new office space.
Install 6 zone hydro-air heating and cooling system; 1 3-ton 2 zone system on second floor. And 1 3 1/2-ton 3 zone system on first floor. And 1 2-ton for basement.
Install new ductwork for the second floor. Renovate and make the second floor. Install a single-zone hydro-air system and a 3-zone hydro system; replace the oil-fired boiler with a new high-efficiency gas wall-hung boiler.
$285KInstall 1 1/2-ton ductless split system to lobby area in building., 5 condensers located in garage below.
4 zone hydro-air heating and cooling system; 2 2 1/2-ton blowers with 2 21/2-ton condensers.
Building. 4. Install ductless split system (1 1/2-ton) in lobby area at building. 4 condenser in garage below.
Move supply into bath, install bath exhaust., duct move return duct, outside bath.
Install a 3-zone hydro-air heating and cooling system; 2 air handlers located in the attic.
Install a 1 1/2-ton ductless split system in the lobby area; the condenser is in the garage below Building 3.
Install 4 zones hot air heating and cooling; 1 60000 btu 2 zone high-eff. System for 2nd and 3rd floors. And 1 60000 btu high-eff. 2 zone system for base/first floor. Bath with 2 1/2 condensate.
Install a 7-zone hydro-air heating and cooling system, including 2 high-efficiency 130000 BTU propane-fired boilers.
Building one: Install a 1 1/2-ton ductless split heat pump in the lobby area, with the condenser mounted on the wall in the garage below.
1 1/2-ton ductless split heat pump to the lobby area; condenser mounted on the wall in the garage below.
Install 2 zone hot-air heating and cooling system, 1 80000 btu furnace located in attic area.
Install a 4-zone hydro-air heating and cooling system, 1 3-ton a/r handler in the basement mechanical room, and 1 3 1/2-ton unit for the second floor. Also includes installing 1 200000 BTU high-efficiency gas-fired boiler.
Install a second zone off the existing heating and cooling system for a new room over the garage.
Install 4 zone hot air heating and cooling system to both units at 23A. 2 60000 btu high-eff. Furnaces to be located in each of the 2 units.
Unit B: new construction of a single-family residence with a finished basement and attached 1-car garage. State education fee paid: $104.00.
$400KInstall a 4-zone hot air heating and cooling system; a 160000 Btu high-efficiency furnace for the top 2 floors and a 100000 Btu furnace for the bottom 2.
Install a 3-zone hot-air heating and cooling system; 1 60000 BTU furnace in the basement and 1 60000 BTU furnace.
Install 4 zone hot-air heating and cooling system; 1 60000 btu high-eff furnace, located in attic and 1 100000 btu high-eff furnace located in basement.
Install 4 zone hot air heating and cooling system, 1 60000 btu furnace with 3-ton cooling in attic and 1 60000 btu furnace with 2 1/2-ton cooling in basement.
Move and add ductwork to 3 extensions to existing rooms 1 master, 2 mud, 3 second floor. Over garage.
Install a 15-zone hydro-air heating and cooling system (does not include any boiler work).
Extend existing supplies into the new addition room.
Move bath supplies and exhaust; add bedroom supplies and returns.
Install 5-zone hydro-air heating and cooling system: 1 a/r handler in attic, 2 a/r handlers in basement, and 2 125000 BTU gas boilers in basement.
Install 2 zone hot air heating and cooling system; 1 60000 btu high eff. Furnace in attic and 1 60000 btu furnace in basement.
Make single zone existing hvac system, 2 zone hvac system; also moving and altering ductwork.
Install a 2-zone hot-air heating and cooling system in each of 4 units; 1 60000 btu furnace in the attic and 1 60000 btu furnace in the basement.
Install a 2-zone hydro-air heating and cooling system, including installation of a 150000 BTU oil-fired boiler.
Install ductwork and VAVs for the second floor, east office area. Ductwork supply and returns connect to the existing house system.
Install 4 zone hot air heating and cooling system; 1: 100000 btu furnace (hi-eff) located in attic and 1 100000 btu; furnace in base.
Install 2 60000 btu high-eff. Furnace, 1 for each apt. And related ductwork.
Remove 2 gas-fired furnaces; install 1 new 165000 BTU high-efficiency boiler and 2 hydro-air handlers; move and install floor supplies in new addition.
Install 4 zone hot air heating and cooling system; 1 40000 btu high-eff furnace on second floor. And 1 3 zone 100000 btu high-eff. Furnace in basement.
1-ton heat pump blower mounted above bath ceiling; condenser moved on back wall.
Install a 2 1/2-ton hydro-air heating and cooling system for the new finished basement area.