Skip to content

Local provider profile

James Labati

Documented work across Connecticut based on attributed municipal records.

Jobs on record1Recorded in our system
Reported work volume$0Documented jobs
Average projectNot availableWhere values are reported
First observed2026Available dataset
Categories1Observed work types
Used for work inRidgefield1 jobs

Work history

Documented work by property

Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.

Aerial image of 39 Buckspen La, Ridgefield, CT

39 Buckspen La

Ridgefield, CT
2026Electrical

Install a disconnect with a 50 amp GFI breaker on the house. Run pipe from the disconnect to the hot tub and make connections in the hot tub. Run a line in the house to the waterfall pump. Set up a transformer for the waterfall low-voltage lights. Install a radio switch to turn them on and off. Run a line from the panel to the disconnect with a two-pole GFI breaker, and feed the sauna from the disconnect. Run a line from the house to feed the gate lights. Provide electricity to the pergola, with 8 wafer lights, one paddle fan, and 2 switches.