Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Plumbing Work
PLU
PL2
$2KFirst floor: Install 2 sinks and 2 dishwashers. Move the gas line for the stove. Water line for the fridge.
First floor: 2 sinks and dishwashers; new plumbing for bar sink and steamer; icemaker and gas stove.
Second floor: 1 water closet, tub, shower, and 2 basins.
Move existing laundry to the other side of the room.
First floor: 1 sink; Second floor: 2 water closets, 3 basins, 1 tub, shower, clothes washer; alteration to existing second floor. Bathroom and kitchen; wash machine plumb on second floor.
First floor: 1 sink; kitchen sink, gas for stove; move sewer line to pipe in kitchen sink.
First floor: 1 water closet, basin, and 2.5-gallon electric water heater. Amendment (8/12/19): First floor: 1 water closet, basin, and 2.5-gallon electric water heater. Electrical.
First floor: 1 water closet, basin, 2.5 gallon water heater.
First floor: 2 water closets, showers, sinks, 2 floor drains, and a drinking fountain.
2 new gas line to supply grill and fireplace; new plumb. Lines for outdoor kitchen.
First floor: First floor: 1 water closet, basin, sink, dishwasher, icemaker.
First floor: 2 water closets, sinks, 1 tub, and shower; all plumbing remains in the same place.
New 1/2 gas line for fireplace in family room.
Replace 2 existing gas-fired water heaters with new 50-gallon gas heaters and plumb them into the existing setup.
$580First floor: 1 sink, dishwasher; alteration to existing kitchen; relocate waterlines for kitchen; repipe stove gas line; new waterline for ice maker.
Gas line to generator. Receipt for $40 paid.
Plumbing alterations to the existing kitchen: 2 sinks.
$1.2KPlumbing for 2 bathrooms and a kitchen in Unit 6.
$1KPlumbing alterations to the existing kitchen (sink, dishwasher, and ice maker).
$5KRelocate gas line to a new location (kitchen).
First floor: 1 water closet, sink (powder room).
First floor: 1 basin, sink; re. Install mop sink to existing plumbing in old utility room; new plumbing rough-in for hand-wash sink in service area.
First floor: 1 water closet, sink, and 2 basins; Second floor: 2 new water closets, 3 basins, 1 tub, shower, and clothes washer; add gas for stove, 2 furnaces, fireplace, and water heater.
Plumbing: replacement of fixtures in the kitchen and powder room.
$600Mechanical — gas to stove only.
$1.5KMove the existing gas line, make the shutoff valve accessible, and reconnect the stove.
First floor: 1 sink, dishwasher.
Second floor: 2 water closets, tubs, showers, and 4 basins.
First floor: 2 water closets, basins, 1 tub, shower.
Gas line to generator. Receipt for $40 paid.
First floor: 1 sink, 2 dishwashers.
New gas line from the main gas meter to the pool heater (distance approximately 20 ft.; line size 1" black iron).
Second floor: 1 water closet, tub, and basin. First floor: new water pipes for kitchen sink and reinstallation of dishwasher.
Second floor: 1 water closet, shower, and sink.
First floor: 2 sinks and dishwashers; alter existing kitchen; move 2 sinks; re. Install 2 dishwashers, an ice maker line, and a gas line for the stove.
Second floor: 1 water closet, tub, and shower; 2 basins.
First floor: 3 sinks, 2 dishwashers; gas stove.
Basement: 1 sink and clothes washer; relocation of N/M and sink; re. Install kitchen faucet and bar sink; move 3/4 gas line approximately 5 ft. To the other side of the wall for the second-floor furnace.
Alteration to laundry room (with m and sink); alteration to kitchen (sink and d/w); new rough for 2 wall mounted with c, re. Install 2 lavs., faucets, and re. Install 2 shower valves.
First floor: 1 water closet and 2 sinks. Second floor: 2 water closets, tubs, 1 clothes washer, a shower, and 3 sinks. 1" new water main; stub out 4" scaw building, only outside; gas stove, gas furnace, and water heater.
Underground gas line (250 ft); pressure test underground, 2 in. Gas line from gas meter to pool heater; test the gas line for proper operation and according to local code.