7 8 2026
Trumbull, CT- 2026Plumbing
New room can-REPLACING PARTIAL CEILING LIGHT FIXTURES, ADDITION OF NEW OFFICE ROOM. NO CHANGE IN EGRESS; NO CHANGE be finished.
$10.2K
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
New room can-REPLACING PARTIAL CEILING LIGHT FIXTURES, ADDITION OF NEW OFFICE ROOM. NO CHANGE IN EGRESS; NO CHANGE be finished.
$10.2KMove vanity Excavate to below grade. On face of wall gravel wrapped and toilet to new location, Change tub to shower. 24†install 18†concrete foo(cid:415)ng for retaining wall and begin wall 6†Wall to have cement on inside of wall, and on top, but no cement (dry look wall). Drainage will be installed behind wall (12†of ¾ in filter fabric), and have weeping holes throughout wall. There.
$5KRun gas piping from main tank in front yard to pool heater and barbecue grill.
$5KPlumbing and fixtures are staying in the same location.
$4KSecond-floor bath. Dormer only.
$8KHeater. Replacing 1 window and 3 exterior doors, painting both the house and garage.
$12KSink Owner had scg install natural gas to property, we piped a manifold in basement for.
$1.3KFuture use and ran a line for a gas stove to hook up asap.
$1.2KReplace gas lines from meter to water heater and furnace.
$1.8KMaster bathroom on the second floor: toilet, 2-bowl sink, shower, and laundry.
$12KInclusive plumbing permit for this address.
$500