12 17 2025
Trumbull, CT- 2025Fire Protection
Piping as determined necessary.
$20K
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
No contact information was found in the available records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Piping as determined necessary.
$20KPlumbing Work
Relocation and renovation of the existing sprinkler system per NFPA 13.
$4.5KRaise 2 sprinkler Fire Sprinkler Ownership. Heads to ceiling height in new T-Swirl tenant area repairs to bring system up to NFPA compliance as part of Change of Replacement of damaged heads / valves, compliance testing and reloction.
$2.3KRelocate existing Convert unfinished sprinkler heads to meet NFPA 13 requirements basement space to finished Rec. Room and Utility space. Not Sleeping.
$2.1KStandpipe system frame new walls, new flooring, new paint, add recessed lights and plugs, and 2 new sinks. A-1, A-2, and E-1 By Guedes Associates, Inc dated 5-1- per NFPA 13 2019 and tested accordingly.
$14.6KFire sprinkler work to relocate sprinklers per new tenant fit-out.
$15.8KCut and cap existing fire sprinkler mains and branch lines in preparation for demolition of the existing Tracey and Community Pavillion buildings.
$125KRelocate sprinkler heads.
$12.4KInstall a new 6" double-check valve on the existing fire sprinkler system.
$4.3KInstallation of a new double-check valve assembly on the fire suppression supply main.
$15K