77 Rockwood Ln
Greenwich, CTKitchen renovation and cosmetic improvements. State ed fee paid $52 Change of Contractor 3.22.21 $40 electrical: 35 devices installed; alterations to kitchen and air conditioning. Amendment (6/22/21): 50 devices installed; wire 2 bathrooms on first floor.; wire to master bathroom., hall bathroom and bedroom 3 bath rooms on second floor.; new recessed lights in first floor. Bath room and office PLUMB: first floor: move 2: water closets, basins, replace 1: water closet, basin, 1 nw: shower, sink, move 2: sinks, 2 nw: dshwshrs., replace 2: hose bibs; Second floor: replace 3: water closets, replace 2: tubs., replace 1: basin, shower, sink, 2 nw: basins, move 1 shower, move 2: basins; relocate gas to new stove.
$200K