300 Atlantic St
Stamford, CT- 2026Building Permit
Build one new ADA restroom on the 11th floor.
$49.9K - 2026Demolition
Reduce the 12th and 14th floors to core (demolition only), 30,220 SF.
$242K - 2026Renovation
Commercial alteration, Level 2: New construction in limited areas, approximately 2,000 SF, in existing office suite #1100, with a total area of 8,500 SF +/-.
$300K - 2026Demolition
Reduce to core 15110 SF of commercial interior space. Demolition only: turn up sprinkler heads and remove all finishes.
$87.5K - 2026Building Permit
Construct a fitness facility on the first floor, 2,884 SF, Use Group B. Construct meeting rooms and a lounge on the second floor, Use Group A, 3,356 SF.
$1.4M - 2026Building Permit
300 Atlantic Street Interior reduce to corefirst and second floor tenant areas. Work area 8,140 SF.
$69.8K - 2026Building Permit
Reduce Suite 300 on the third floor to core by removing interior partitions, ceilings, and associated mechanical, electrical, and plumbing systems. Work area: 17,160 SF.
$87.5K - 2025Demolition
Commercial interior, Level 2 alteration to the existing open area and one additional office. Demolition, ceiling, walls, and MEP system for new work. 1,528 SF.
$78.9K - 2025Renovation
ZNC Suite second-floor Level 2 alteration to an existing Use Group B office suite. Work area: 825 SF.
$71K - 2025Renovation
Level 2 alteration to renovate an existing 720 SF Use Group B office, adding 2 existing offices and one open area.
$58.7K - 2025Renovation
Level 2 Alteration for Freight Investors, Suite 204. Work area 1255SF. Use group B Offices.
$68.9K - 2025Renovation
Commercial interior alteration of 5,995 SF for tenant Fifth Season on the 8th floor. Use Group B. No change of use, egress, or occupancy.
$402K - 2025Renovation
Commercial interior renovation of a Use Group B office space for Kelley Drye Warren on the 7th floor. Work area: 7,763 SF. No change to use, egress, or occupancy.
$639K - 2022Renovation
Alteration of Suite 500 for Astoria Gen on the 5th floor.
$57.2K - 2019Renovation
Interior renovation of Suite 202.
$168K - 2019Renovation
Renovation of existing fifth-floor restrooms, approximately 370 SF.
$85K - 2019Mechanical
Commercial alteration for the existing 5th-floor tenant, Eastern Generation. Approximately 8,311 SF. Fully sprinklered. This project will also require electrical, fire alarm, and sprinkler permits. Existing HVAC system to remain.
$227K - 2019Electrical
Interior alterations to existing Suite 301. No tenant at this time. This project will also require electrical and sprinkler permits. Revised to change one wall type and add a couple of power/data locations. No change in cost or square footage. SLR 6/28/19.
$31.8K