5 4 2026
Trumbull, CT- 2026Mechanical
For the second floor only.
$18K
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
No contact information was found in the available records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
For the second floor only.
$18KInstallation of a wall-mounted ductless heat pump in the garage.
$8KHVAC
Replacing an oil-fired boiler with a gas hot water boiler.
$15KReplace the central air conditioning system. Install a 48000 BTU American Standard TEM 6 variable speed air handler with a 48000 BTU American Standatd 15 SEER condenser.
$25KReplace the oil-fired hot water boiler with a condensing gas boiler and a 30-gal. indirect hot water maker for Unit A.
$12.9KReplace the oil-fired hot water boiler with a condensing gas boiler and a 30-gal indirect hot water maker, Unit B.
$12.9KReplace existing oil furnace with condensing gas furnace, no AC, 1 American standard stage btu up flow natural gas furnace.
$4.2K