3 Lauder Way
Greenwich, CT2 jobs on recordPlumbing Work
$2.8KView all 2 jobs
- 2024Plumbing
Plumbing Work
$2.8K - 2023Electrical
Electrical Work
$32K
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Plumbing Work
$2.8KPlumbing Work
$2.8KElectrical Work
$32KInstall a 20 kW generator on top of the existing attached garage.
$15KElectrical Work
$90KELE
EL2
$40KAdditional 48 kW generator with 200-amp ATS; the property will now have 2 48 kW generators.
$26KAdditional 48 kW generator with 200-amp ATS; the property will now have 2 48 kW generators.
$26KRelocate utility transformer and 1000 A main disconnect; install 400 A temporary service. Existing 1000-amp service.
$24KRelocate existing 48 kilowatt generator. NEC plumbing: gas piping for power generator. Receipt 21-0638 for $40 paid.
$3.5K48 kW generator; remove and replace 1000 A main disconnect.
$19K1 range, oil burner motor, range top, well pump; 2 dishwashers; 3 clothes dryers; 6 air conditioning motors; 400-amp service. Service note. Amendment (12/7/18): relocate temporary 200-amp service. Amendment (6/2519): 1000-amp service.
Install 2 bay garage door openers, 1 ductless air conditioning, 8 GFI receptacles, 3 outdoor lights, 4 indoor lights.
36 kW standby generator with 400 A ATS. Plumbing: liquid propane gas line to generator. Receipt 21-0462 for $40 paid.
$2.1K36 kW standby generator with 400 A ATS. Plumbing: liquid propane gas line to generator. Receipt 21-0462 for $40 paid.
$2.1KBasement bathroom. 3 switches, 1 outlet, and 2 light fixtures. Building permit: 21-5744.
$500Electrical: 200-amp service upgrade.
$2K22 kW generator. Plumbing: gas line to generator. Receipt 20-0156.
$9K22 kW generator. Plumbing: gas line to generator. Receipt 20-0156.
$9K400-amp service,. Whole-house wiring, including phone and cable; 510 devices; 1 range, 1 oven, clothes dryer, 5 air-conditioning units, 1 oil burner, 6 circulator motors, and 1 dishwasher. Amendment (1/8/20): 400-amp service; whole-house 120/240 V wiring throughout; 300 devices installed; 1 range, oven, clothes dryer, oil burner motor, and range top; 2 dishwashers; 7 circulator motors; 4 air-conditioning motors.
Install owner-supplied 20 kW standby liquid propane generator with 200-amp automatic transfer switch; relocation of existing generator. Plumbing: liquid propane gas to generator. Receipt 21-0463 for $40 paid.
$1.8KInstall owner-supplied 20 kW standby liquid propane generator with 200-amp automatic transfer switch; relocation of existing generator. Plumbing: liquid propane gas to generator. Receipt 21-0463 for $40 paid.
$1.8K230 devices installed; whole-house remodel; 1 range, oven, clothes dryer, oil burner motor, well pump; 2 dishwashers; 4 air-conditioning motors; 5 circulator motors. All new mechanical equipment.
48 kW generator. Plumbing: gas line to generator. Receipt 19-2351 for $40 paid.
$26K48 kW generator. Plumbing: gas line to generator. Receipt 19-2351 for $40 paid.
$26K1 device installed; wire sewer ejector pump.
100-amp O. H. temporary service.
$250637 devices installed; 1: oven, rngtp, dishwasher, wtr. Htr., gasbrnr. Motor, 2: clthsdryrs., 5 air conditioning motors, electrical. Htrs., 12 circ. Motors; 400-amp service; line voltage only, phone, cable, security (wiring by others).
100-amp overhead temporary service.
65 devices installed; new lighting and switches; master bedroom closet and bath remodel.
Master bathroom remodel with new lights and switches on the first floor, and basement addition; new plugs, switches, and lights throughout the garage, exercise room, family room, and expanded kitchen.
120 devices installed; basement remodel; all new wiring in the basement, bathroom, recreation room, and patio.
30 kW generator HVAC: gas line to generator. Receipt for $40 paid. 19-1851.
$20K30 kW generator HVAC: gas line to generator. Receipt for $40 paid. 19-1851.
$20K175 devices installed; 1 range, oven, 2 clothes dryers, 1 oil burner motor, dishwasher, and 3 air conditioning motors. 800-amp service; install line-voltage wiring, lighting receptacles, and appliances throughout the dwelling, including HVAC equipment; refeed existing 200-amp service.
20 kW generator and 200 auto transfer switch.
$9K20 kW generator and 200 auto transfer switch.
$9KPoolhouse renovation, new wiring for new second floor. Staircase, closets, bedroom, bathroom, air handlers; renovated first floor. Powder room, living room., bedroom, den; kitchen first floor. Full bath, 200-amp service are existing to remain.
30 devices installed; replace lighting, plugs, and switches. Appliances remain.
15 kW generator. Plumbing: underground gas line for generator. Receipt 18-3686 for $40 paid.
$2.4K15 kW generator. Plumbing: underground gas line for generator. Receipt 18-3686 for $40 paid.
$2.4K215 devices installed; 1: rng., oven, clthsdryr, dishwasher, wtr. Htr., gasbrnr. Motor, 4 air conditioning motors, 5: circ. Motors; 400-amp service; complete wiring and lighting/device installaiton.
45 kW generator. HVAC: gas line to generator. Receipt 17-3297 for $40 paid.
$20K45 kW generator. HVAC: gas line to generator. Receipt 17-3297 for $40 paid.
$20KInstall 4 GFI receptacles, 6 lighting fixtures, and 3 fan outlets in the detached cabana.
1: rng., wellpmp, oil burner motor, 2: clthsdryrs., 5 air conditioning motors; 400-amp service, underground new.
Master bathroom. Renovation and living room. Also; removereplace decorative fixtures, basement bathroom. Renovation.
Master bathroom. Renovation and living room. Also; removereplace decorative fixtures, basement bathroom. Renovation.
38 kW generator. Plumbing: gas line to generator. Receipt 17-3496 for $40 paid.
$28K23 devices installed.
Special event lighting. Receipt 17-2887 for $100 paid. Inspection 9/19/17 at 10 AM.
Special event lighting. Receipt 17-2887 for $100 paid. Inspection 9/19/17 at 10 AM.
Special event lighting. Receipt 16-3492 for $100 paid.
Second-floor space straight ahead upon exiting the elevator. Install voice, data, and A/V wiring throughout the space, with 120-volt outlets as needed to feed the A/V equipment only.