275 Mason St
Greenwich, CT- 2024Electrical
Electrical Work
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Electrical Work
Plumbing Work
Plumbing Work
Plumbing Work
Plumbing Work
PLU
First floor.: fixtures relocated in master bath; cap off 1 exist. bathroom.; add bathrom powder room., kitchen; lower floor.: replace fixtures in bathroom.; water htr.; Basement: replace 1: water closet, sink, shower.; First floor: 3 nw: water closets, 6 nw: sinks, 2 nw: tubs., 1 nw: shower, clothes washer, dishwasher, 3 nw: hose bibs.
Install a 2-stage regulator and connect the pool heater.
Underground gas line (propane) for future pool.
$1.8KGarage: 1 new water closet and sink; 2 new hose bibs.
First floor: 1 water closet, tub, shower, sink, and dishwasher; 2 basins. Second floor: 1 new water closet and basin. Relocate gas stove.
Basement: 1 water closet, basin, shower, clothes washer, 4 hose bibs, and 2 sinks. First floor: 3 water closets, sinks, 4 basins, 2 dishwashers, 1 shower, and tub. Second floor: 4 water closets, 2 tubs, 3 showers, 1 sink, clothes washer, and floor drain. Schedule 40 PVC for waste and vents; PEX tubing for water; black steel and flexible tubing for gas. Gas piping for 2 dryers, 1 stove, 2 water heaters, 4 HVAC units, and 1 heating boiler for jacuzzi. Amendment (8/21/20): Underground poly plastic piping and risers; underground gas line for existing pool heater.
Gas line to generator. Receipt 18-2823 for $40 paid.
First floor: new water closet, shower, and sink.
Unit A – underground gas lines for fire pit and barbecue.
$1.1KFirst floor: 1 sink, dishwasher, and gas test.
Install underground piping for a future kitchen. Replace the existing underground main waste line.
$1.8KNew water main, 1" piping from curb valve to inside water meter, with a new isolating value.
$1.2KSecond floor: 2 water closets and tubs. Third floor: 3 water closets, tubs, and 2 sinks. Install new hot and cold water risers to each bathroom and kitchen from the basement.
Basement: 2: clthswhsrs., hose bibs; First floor: 2 water closets, showers, dshwshrs., 1 basin; Second floor: 2 water closets, showers, dshwshrs., 1 basin; Second floor: 2 water closets, showers, dshwshrs., 1 basin; Third floor: 2 water closets, showers, dshwshrs., 1 basin; gastest 6 stoves, 6 water htrs., 1 owner water htr., 6 furnaces, condensate drain. Amendment (7/21/16): new water service for building.