Skip to content

Local provider profile

Joseph L Ruvolo

Documented work across Connecticut based on attributed municipal records.

Reported work volume$9.5KDocumented jobs
Average project$1.9KWhere values are reported
First observed2026Available dataset
Categories1Observed work types
Used for work inGreenwich3 jobsTrumbull1 jobsWeston1 jobs

Contact information

Details found in public records

These details have not necessarily been claimed or independently confirmed by the provider.

Phone
860-505-9072source record
Email
[email protected]source record

Work history

Documented work by property

Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.

Satellite view of 8 25 2026, Trumbull, CTSatellite view
2026

8 25 2026

Trumbull, CT
  • 2026Electrical

    Tying in electrical 1. Strip and there is existing Existing decking: eaves and rakes. On six feet on prone to leaking. Install Owens fiberglass. 7. Install Owens as shingle choice. Number: 3 chimney and not properly building code. Installed with centered on Gable vents building code be installed. Intersection flashing. Ice boards will Decorative 190ft of White with Sureguard Chimney by for AC. Including new whip and disconnect for outdoor unit. Remove existing shingles on home to decking: 1 and 2 layer 2100 SF 2. If plywood decking, seams will be taped with 4 inch joint tape. Plywood 3. Extra wide F-8 aluminum drip edge will be installed on Color: White 4. Install Owens Corning Rhino Ice and Water Barrier first course, on intersecting roof sections, in valleys and all areas 5. Install Owens Corning Starter Strip Plus on eaves and rakes. 6. Corning Pro Armor wide synthetic underlayment with reinforced Install architectural Owens Corning Shingle. Duration Color: TBD 8. Corning ProEdge Ridge Cap Shingles in all ridges and hips same color 9. Install new seamless never leak vent boots around vent pipe. 10. Additional vents will be replaced: 11. Properly step flash around install new lead counter flashing. 2 chimneys 12. Current ventilation is working and will be modified. Current ventilation is not to current 13. Current Ventilation on the house : New ridge vent will be approximately 64 feet of inflow vent. 40 ft ridge will have 24ft of in flow vent each side and 24 ft ridge will have 12 ft centered on each side of ridge. Will be closed from the inside. This will bring ventilation to current and manufacturers spec. Additional Details: 26 ft of skirt boards will Existing siding will need to be cut out along roof line at roof wall to remove all damaged step flashing and replace with new step and water will be installed behind step flashing and primed pine skirt be installed with Z flashing as counter flashing. 5 sheets of sheathing w rake tail covering will be cut flush with fascia during roof install. Approximately 5inch seamless heavy duty gutters and downspouts will be installed gutter guards. Old gutters will be removed and disposed of. Driveway should be partially rebuilt along top courses to prevent.

    $2.5K