2023
23 Maher Dr
Norwalk, CT- 2023Mechanical
Run a black-pipe gas line 20 ft above ground to the existing whole-house generator; place (3) 120-gallon propane tanks.
$4.5K
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
No contact information was found in the available records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Run a black-pipe gas line 20 ft above ground to the existing whole-house generator; place (3) 120-gallon propane tanks.
$4.5K