2019New Construction
Construct a two-story motor vehicle sales and service building. Plan review conditions apply. State education fee paid: $565.76. HVAC: First floor: 1 sink, 2 floor drains, and hose bibs. Install 2 floor drains in the garage. Electrical: 400-amp service, underground electrical, and UFER grounding. Amendment (12/18/19): 125 devices installed; 400-amp service, 480 V, low-voltage wiring, fire alarm, site lights, and UFC ground. Plumbing: Install relocated water service piping across the open lot. The water service feeds McDonald's Restaurant from Oakridge St. Plumbing (2): First floor: 1 water closet and sink. Second floor: 2 water closets, sinks, 1 laundry tub, and basin. Install gas from 2 rooftop units.
$2.2M