Skip to content

Local provider profile

Kelly Alencastro

Documented work across Connecticut based on attributed municipal records.

Reported work volume$82.2KDocumented jobs
Average project$27.4KWhere values are reported
First observed2026Available dataset
Categories1Observed work types
Used for work inRidgefield3 jobs

Contact information

Details found in public records

These details have not necessarily been claimed or independently confirmed by the provider.

No contact information was found in the available records.

Work history

Documented work by property

Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.

Satellite view of 545 Main St, Ridgefield, CTSatellite view
2026

545 Main St

Ridgefield, CT
  • 2026Roofing

    Tear-off and Cleanup: The old roofing materials will be removed. 50 SqRoof Deck Inspection and Repairs: Check the condition of the roof deck (the structural surface beneath the roofing material). If there's damage or rot, it should be repaired or replaced to ensure a stable foundation for the new roof. Ventilation and Insulation: Evaluate your roof's ventilation and insulation needs. Proper ventilation and insulation are essential for energy efficiency and the longevity of your new roof. Material Installation: The roofing contractor will install the new roofing material according to the manufacturer's specifications and industry best practices. This includes underlayment, flashing, and shingle or roofing material installation. Plywood seam tape. See in part, the following code requirements. IRC Code Section R905.1.1 UnderlaymentA minimum 4-inch-wide (102 mm) strip of self-adhering polymer-modified bitumen membrane complying with ASTM D 1970, installed in accordance with the manufacturer's instructions for the deck material, shall be applied over all joints in the roof decking. Underlayment shall be applied over the entire roof and over the 4-inchwide (102 mm) membrane strips and shall be applied in accordance with Table R905.1.1(2). Underlayment shall be attached in accordance with Table R905.1.1(3).

    $30K
Satellite view of 5 Conley Ct, Ridgefield, CTSatellite view
2026

5 Conley Ct

Ridgefield, CT
  • 2026Roofing

    Tear-off and Cleanup: The old roofing materials will be removed. 41 sq. Roof Deck Inspection and Repairs: Check the condition of the roof deck (the structural surface beneath the roofing material). If there's damage or rot, it should be repaired or replaced to ensure a stable foundation for the new roof. Ventilation and Insulation: Evaluate your roof's ventilation and insulation needs. Proper ventilation and insulation are essential for energy efficiency and the longevity of your new roof. Material Installation: The roofing contractor will install the new roofing material according to the manufacturer's specifications and industry best practices. This includes underlayment, flashing, and shingle or roofing material installation. Plywood seam tape. See in part, the following code requirements. IRC Code Section R905.1.1 UnderlaymentA minimum 4-inch-wide (102 mm) strip of self-adhering polymer-modified bitumen membrane complying with ASTM D 1970, installed in accordance with the manufacturer's instructions for the deck material, shall be applied over all joints in the roof decking. Underlayment shall be applied over the entire roof and over the 4-inchwide (102 mm) membrane strips and shall be applied in accordance with Table R905.1.1(2). Underlayment shall be attached in accordance with Table R905.1.1(3).

    $34.9K
Satellite view of 14 Armand Rd, Ridgefield, CTSatellite view
2026

14 Armand Rd

Ridgefield, CT
  • 2026Roofing

    Tear-off and Cleanup: The old roofing materials will be removed. 29 SqRoof Deck Inspection and Repairs: Check the condition of the roof deck (the structural surface beneath the roofing material). If there's damage or rot, it should be repaired or replaced to ensure a stable foundation for the new roof. Ventilation and Insulation: Evaluate your roof's ventilation and insulation needs. Proper ventilation and insulation are essential for energy efficiency and the longevity of your new roof. Material Installation: The roofing contractor will install the new roofing material according to the manufacturer's specifications and industry best practices. This includes underlayment, flashing, and shingle or roofing material installation. Plywood seam tape. See in part, the following code requirements. IRC Code Section R905.1.1 UnderlaymentA minimum 4-inch-wide (102 mm) strip of self-adhering polymer-modified bitumen membrane complying with ASTM D 1970, installed in accordance with the manufacturer's instructions for the deck material, shall be applied over all joints in the roof decking. Underlayment shall be applied over the entire roof and over the 4-inchwide (102 mm) membrane strips and shall be applied in accordance with Table R905.1.1(2). Underlayment shall be attached in accordance with Table R905.1.1(3).

    $17.3K