2019
8 N Seir Hill Rd
Norwalk, CT- 2019Mechanical
Mechanical: Install (2) LP tanks and gas piping for generator.
$3K
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
No contact information was found in the available records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Mechanical: Install (2) LP tanks and gas piping for generator.
$3KMechanical: Remove the oil steam system and install ductwork and gas piping for new equipment only—a new furnace and AC.
$15KMechanical: replace oil boiler with gas, pipe, venting, and gas pipe.
$6KMechanical: gas piping for a generator.
$1.5K