Install 50' of 3/4 flex gas piping from the existing header in the utility room to the stove. Install a remote gas shutoff in the cabinet and tie into the stove upon completion.
$1.8K
View all 2 jobs +
2025Mechanical
Install 50' of 3/4 flex gas piping from the existing header in the utility room to the stove. Install a remote gas shutoff in the cabinet and tie into the stove upon completion.
$1.8K
2025Plumbing
Replace the existing cast iron kitchen sink drain with PVC. Install new shutoffs for the sink and dishwasher, install the faucet, dishwasher, and stove, and connect the ice maker line to the fridge.
Install a new shower valve and vinyl shower pan, new basin valves and faucet, and a new toilet in the master bath. Work also includes a new shower, valve, and pan; basin valves and faucet; a new toilet; and adding a new tub valve.
Plumbing for the master bathroom, including moving the toilet location; revamping the waste and water lines for two new vessel sinks in a double vanity; roughing in new waste and water lines for a new soaking tub and new shower fixtures; installing fixtures for completion; and moving the stove gas line with a new shutoff in the cabinet.
Install an Hi gas line from the meter into the utility room and tie into the existing 1" gas line that is to feed the new generator. Receipt 20-1845 for $40 paid.
Second floor: Replace 1 water closet, tub, and basin; remove existing fixtures, replace old drain and water lines if necessary, and re. Install fixtures.
View all 2 jobs +
2019Plumbing
Second floor: Replace 1 water closet, tub, and basin; remove existing fixtures, replace old drain and water lines if necessary, and re. Install fixtures.
2019Demolition
Drain the second- and third-floor zones; remove the bathroom and bedroom radiators for demolition and re. Install them upon completion of both rooms. Also install a radiator in the third-floor office, which was previously removed by others.
First floor: Replace 2 water closets and 1 basin; install a shower, 1 new tub, and a dishwasher. Move 1 basin and sink. Install a new kitchen sink, waste, and water. Install gas to the stove and tie in.
1st, 2nd, and 3rd levels of unit: install gas line to all 3 fireplaces and install log sets. Black pipe on the outside for the lower level and Wardflex for the others. Note: The main gas header located on the left side of the complex is bonded.
Basement: 1 new laundry basin; replace 1 clothes washer and hose bibb. Install waste, vent, and water lines for existing washing machine and L-sink. Also install a frostproof sillcock in place of the old faucet. Note: Mechanical vents to be used due to no availability of existing vents.