Change new windows, new roofs, new doors, change new kitchen cabinets and bathroom cabinets, eliminate the chimney and eliminate the wall between kitchen and dining room, adding front single roof porch, change hot water tank and change the oil heating into gas heating. reverted to finish basement knr 05/17/2019 no charge for the basement original project cost covers the additional work plus original work [$30210+17840=$481610.00] KNR 05/20/2019.
Replace windows and doors; open the wall between the kitchen and dining area; change the kitchen and bathroom cabinets; replace oil heating with gas heating and replace the hot water tank; convert the half bath to a full bath. Trades needed for this jobsite project: electrical, plumbing, and mechanical. Rough: framing, electrical, plumbing, and mechanical. Finals: building, electrical, plumbing, and mechanical.