499 Den Ln
Greenwich, CT- 2026Plumbing
Plumbing Work
- 2026Mechanical
HVAC Work
- 2026Building Permit
Add To &
$380K
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Plumbing Work
HVAC Work
Add To &
$380KAlteration
$200KAccessory Structure.
$1.1M3500 set meter to the generator at the Kitchen Remodel-stays within orginal foot print-install new lighting.
$6.6KConstruction of a new water supply pump station. Install new pumps, generator, and HVAC. Application withdrawn: Per Section 105.2.3 of the CSBC, public service agencies do not require a permit from the Department of Buildings.
$1.4MNew pump station and valve vault, pumps, piping, and generator.
$1.2MNew pump station and valve vault, including pumps, piping, and a new generator.
$1.9MPumps, generator, controls, electrical, HVAC, plumbing, concrete structure, gas service, and electric service. State education fee paid: $232.70. Electrical: 200-amp Temporary service, single-phase, for construction.
Pumps, generator, controls, electric, HVAC, plumbing, concrete structure, gas service, and electric service. State education fee paid: $232.70. HVAC: Install 2 dehumidifiers per plans on file. Plumbing: Furnish and install 1 1/2" gas line from the meter bar to the new generator. Electrical: 200-amp temporary, single-phase service for construction. Amendment (2/6/20): 2 air-conditioning motors, 3 electrical heaters, well pumps, 1 attic fan, water heater; 400-amp service; new water pumping station. Eversource lists the address as 100 Laddins Rock. 10-13-20: Relocate temporary service. 12/7/20: Amend permit with due to time lapse for project to begin. Eversource required a new filing.
$895KRehabilitation of the existing sewage pump station. New precast concrete wet well, valve chamber, and cast-in-place concrete control building. State education fee paid: $76.96. Electrical: 1 water heater, air-conditioning motor, electrical heater; 2 sewage pumps; 200-amp service. Amendment (12/19/17): Flood zone. 100-amp temporary service (3 om) for construction of new pump station. 120/208v 3 om.
$296K201701751-IRC. Rehabilitation of the existing sewage pump station. New precast concrete wet well, valve chamber, and cast-in-place concrete control building. State education fee paid: $110.50. Electrical: 1 water heater wiring, air-conditioning wiring, and electric heater; 2 sewage pump motors. Amendment (12/19/17): 100-amp service; 100-amp, 3 om temporary service for construction of new pump station, 120/208v 3 om. Amendment (4/24/20): Install 12 devices, 3 kW air conditioning, 12 kW pump, and 200-amp service.
$425KRehabilitation of the existing sewage pump station. New precast concrete wet well, valve chamber, and cast-in-place concrete control building. State education fee paid: $76.70. Electrical: 1 air conditioning motor, electrical heater, water heater, and 2 sewage pumps; 1 air conditioning motor, electrical heater, water heater, and 2 sewage pumps. 100-amp 3 om temporary service for construction of new pump station. 120/208V 3om. 100-amp.
$295KBuild a new water pump station with new pumps, generator, control panel, and HVAC. Demolish the existing water pump station after the new one is complete. State education fee paid: $466.44. HVAC: Install 2 dehumidification systems, 5-ton each, with ACR piping. Electrical: 50 devices installed; 2 air conditioning motors, electrical heaters, 4 well pumps, and 1 circulation motor; service to be 600-amp. Add well pump station per plans and specifications of Tata and Howard Engineering dated March 2016. Plumbing: Install underground 1 1/2-inch burial; gas line to pump house; run 1 1/2-inch black Schedule 40 gas line to generator in pump house; run 1 1/2-inch vent from regulator inside pump house to outdoors (generator is on building permit).
$1.8M3 Final Clarifier Tanks, Rehab, Remove and replace-scum pump and piping, control panel and misc louves and dampers. State Ed. Fee paid.: $130.00 electrical: 10 devices installed; 2 air conditioning motors, 2 scum pumps, 3: CLM motors, replace claifier equipment per plans and specs. Of Gannett Fleming June 2015. Amendment (8/22/16): temporary service 200-amp for construction trailer; service exists from past construction project; Eversource will reenergize and install a meter; we wired to construction trailer panel (trailer feed 100-amp 1 om).
$500K