55 Railroad Ave
Greenwich, CTPlumbing Work
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Plumbing Work
Plumbing Work
$1.8KHVAC
Plumbing Work
Plumbing Work
Plumbing Work
Plumbing Work
Plumbing Work
Alteration
$80KHVAC Work
$1.2KGas line for generator. Receipt 21-3662 for $40 paid.
Gas line for generator. Receipt 21-3662 for $40 paid.
New plumbing and gas work, new water line for new house. Bsmt 1n w.c., 1stflr 2n w.c., 2n sink, 1n d/w, second floor 5n w.c., tubs 2n, 4 n sinks, 4n shower, 1n c/w.
Second floor: move 1: laundry tub, clothes washer.
Second floor: 1 new water closet, tub, shower, and 2 new basins. Plumbing work for a new master bathroom; gas work for heating unit and fireplace.
New plumbing for 4 bathrooms, kitchen, and laundry.
$18KNew plumbing for 4 bathrooms, kitchen, and laundry.
$18KMechanical: gas line for kitchen stove, hot water heater, and 2 heating units.
$3KFirst floor: Replace 1 sink, laundry tub, and dishwasher. Second floor: Replace 1 water closet and tub; replace 2 basins; move 2 basins and move 1 shower, tub, and water closet. Gas line for kitchen stove.
Basement: 1 new water closet, basin, and shower. First floor: 2 new water closets and basins, 1 new tub, and sink. Second floor: 3 new water closets, 2 new tubs, 1 new basin, shower, laundry tub, and clthhswshr. Gas work for boiler, stove, and 3 fireplaces.
Basement: 1 new water closet, basin, and shower. First floor: 2 new water closets and basins, 1 new tub, and sink. Second floor: 3 new water closets, 2 new tubs, 1 new basin, shower, laundry tub, and clthhswshr. Gas work for boiler, stove, and 3 fireplaces.
Gas line to generator. Receipt 19-2651 for $40 paid.
First floor: Replace 2 water closets, move 3 basins, and move 1 shower. Replace some vent piping and move waterlines for the new layout of the powder room and master bath; remodel existing bathrooms.
Second floor: Move 1 water closet and shower; add 1 new sink and replace, 1 sink.
Gas line to generator. Receipt 18-2863 for $40 paid.
Gas line to generator. Receipt 18-2863 for $40 paid.
04058. Basement: 1 new water closet and basin. First floor: 1 new water closet, basin, sink, and dishwasher. Second floor: 2 new water closets, 3 new basins, 1 new tub, shower, and clothes washer. Third floor: 1 new water closet, basin, and shower. Gas work for 3 fireplaces and kitchen stove.
Move 1 water closet and basin; replace 1 sink. Second floor: replace 1 water closet, tub, and shower; replace 2 sinks.
First floor: replace 1 sink.
First floor: 1 new water closet, basin, and sink. Second floor: 5 new water closets and basins, 4 new showers, 2 new tubs, 1 new sink, and clhswhsr. Gas work for stove, boiler, barbecue, and fireplace. 1" water main line from water meter pit to house.
Third floor: Replace 1 water closet, basin, and shower. Amendment (10/13/17): Second floor: 1 new water closet, tub, and shower; 2 new basins.
Gas line for generator.
Gas line for generator.
Basement: 1 nw: water closet, basin, shower, sink Amendment (3/20/17): basement: 1 nw; water closet, basin, shower; First floor: 2 nw: water closets, basins, 1 nw: sink, dishwasher; Second floor: 6 nw: water closets, showers, 7 nw: basins, 2 nw: clthswshrs., 1 nw: laundry tub, tub; gas work for kitchen stove, heat unit hydro and water htr.
Second floor: replace 1 water closet and shower; replace 2 sinks.
Underground plumbing for future 2 floor- modular addition (3" pvc sch 40). Amendment (10/18/17): 1 sink; Second floor: 2 water closets, 1 tub, shower, 3 basins.
Basement: 2 new water closets and basins, and 1 new shower; First floor: 2 new water closets and basins, dishwashers, 1 new sink, and laundry tub; Second floor: 4 new water closets, 5 new basins, 2 new tubs and showers, 1 new laundry tub, and clothes washer; gas work for stove, boiler, and 4 fireplaces; new water main.
Basement: 2 new water closets and basins, and 1 new shower; First floor: 2 new water closets and basins, dishwashers, 1 new sink, and laundry tub; Second floor: 4 new water closets, 5 new basins, 2 new tubs and showers, 1 new laundry tub, and clothes washer; gas work for stove, boiler, and 4 fireplaces; new water main.
Gas line for generator. Receipt 18-0203 for $40 paid.
First floor: move 2 water closets, basins, and sinks. Second floor: moved 3 water closets, move 2 tubs, moved, 1 shower, clothes washer.
Basement: 1 new water closet, basin, and shower. First floor: 2 new water closets, basins, and 1 new sink. Second floor: 4 new water closets, 5 new sinks, 2 new tubs, showers, 1 new laundry tub, and clothes washer Gas work for stove, hot water heater, and fireplace.
Basement: 1 new water closet, basin, and shower. First floor: 2 new water closets, basins, and 1 new sink. Second floor: 4 new water closets, 5 new sinks, 2 new tubs, showers, 1 new laundry tub, and clothes washer Gas work for stove, hot water heater, and fireplace.
Gas line to generator. Receipt for $40 paid.
Gas line for outside barbecue.
Basement: 1 new water closet and basin. First floor: Move 1 water closet and basin; replace 1 clothes washer; 1 new sink. Second floor: 1 new water closet and shower; move 1 laundry tub; move 2 showers, basins, and water closets. Third floor: 1 new water closet and basin. Gas work for stove (new location).
Basement: 1 new water closet and basin. First floor: Move 1 water closet and basin; replace 1 clothes washer; 1 new sink. Second floor: 1 new water closet and shower; move 1 laundry tub; move 2 showers, basins, and water closets. Third floor: 1 new water closet and basin. Gas work for stove (new location).
Gas line to generator. Receipt for $40 paid, 16-2538.
First floor: replace 1 sink and dishwasher. Second floor: replace 1 water closet, basin, and shower.
Second floor: 1 new water closet, basin, and shower in art studio.
Gas line to generator. Receipt for $40. 16-1737.
Gas line to generator. Receipt for $40. 16-1737.
Basement: 1 new water closet, basin, and shower. First floor: 2 new water closets, basins, and sinks; 1 new dishwasher. Second floor: 4 new water closets, 5 new basins, 3 new showers, 1 new tub, laundry tub, and clothes washer. Gas work: stove, water heater, and 2 heating units.
Gas line to generator. Receipt 16-1441 for $40 paid.
Basement: 1 sink. First floor: 1 new sink, clothes washer, and dishwasher. Second floor: 2 new water closets, 1 new tub, 3 new basins, and 1 new shower.
First floor: 2 new water closets, basins, and sinks. Second floor: 5 new water closets, 6 new basins, 4 new showers, 1 new tub, laundry tub, and clothes washer Gas work for the boiler, stove, and fireplace.
Gas line to generator. Receipt 16-0136 for $40 paid.