Documented work across Connecticut based on attributed municipal records.

Reported work volume$15.4MDocumented jobs
Average project$468KWhere values are reported
First observed2020Available dataset
Categories3Observed work types
Used for work inNorwalk13 jobsStamford11 jobsGreenwich9 jobs

Contact information

Details found in public records

These details have not necessarily been claimed or independently confirmed by the provider.

No contact information was found in the available records.

Work history

Documented work by property

Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.

Satellite view of 235 W Main St, Stamford, CTSatellite view
2024

235 W Main St

Stamford, CT
  • 2024Roofing

    Renovation of Parkside Gables “Building 3, ” a 3-story, 20-unit building. Work includes roofing, siding, porch railings, windows, kitchens, bathrooms, and upgrades to plumbing, electrical, and mechanical systems.

    $1.3M
  • 2024Roofing

    Renovation of Parkside Gables “Building 7, ” a 1- and 2-story, 4-unit building. Work includes roofing, siding, porch railings, windows, kitchens, bathrooms, and upgrades to plumbing, electrical, and mechanical systems.

    $269K
  • 2024Roofing

    Renovation of Parkside Gables "Building 6" - 2 story, 2-unit building - Roofing, siding, porch railings, windows, kitchens, bathrooms, upgrade plumbing, electrical and mechanicals.

    $149K
  • 2024Roofing

    Renovation of Parkside Gables “Building 9, ” a 3-story, 10-unit building. Work includes roofing, siding, porch railings, windows, kitchens, bathrooms, and plumbing, electrical, and mechanical upgrades.

    $958K
  • 2024Roofing

    Renovation of Parkside Gables “Building 1, ” a 3-story, 7-unit building. Work includes roofing, siding, porch railings, windows, kitchens, bathrooms, and upgrades to plumbing, electrical, and mechanical systems.

    $380K
  • 2024Roofing

    Renovation of Parkside Gables “Building 2, ” a 3-story, 8-unit building with 1 community room. Work includes roofing, siding, porch railings, windows, kitchens, bathrooms, and plumbing, electrical, and mechanical upgrades.

    $762K
  • 2024Roofing

    Renovation of Parkside Gables “Building 8, ” a 3-story, 7-unit building. Work includes roofing, siding, porch railings, windows, kitchens, bathrooms, and plumbing, electrical, and mechanical upgrades.

    $847K
  • 2024Roofing

    Renovation of Parkside Gables “Building 5, ” a 3-story, 2-unit building. Work includes roofing, siding, porch railings, windows, kitchens, bathrooms, and upgrades to plumbing, electrical, and mechanical systems.

    $149K
  • 2024Roofing

    Renovation of Parkside Gables "Building 4, " a 3-story, 2-unit building: roofing, siding, porch railings, windows, kitchens, bathrooms, and plumbing, electrical, and mechanical upgrades.

    $149K
Satellite view of 1 Monterey Pl, Norwalk, CTSatellite view
2024

1 Monterey Pl

Norwalk, CT
  • 2024Build Alt Comm

    Upgrades and repairs, including kitchen, bathroom, and accessibility improvements, to Building 1.

    $150K
  • 2024Build Alt Comm

    Upgrades and repairs, including kitchen, bathroom, and accessibility improvements, in Building 11.

    $181K
  • 2024Build Alt Comm

    Upgrades and repairs, including kitchen, bathroom, and accessibility improvements, in Building 9.

    $118K
  • 2024Build Alt Comm

    Upgrades and repairs, including kitchen, bathroom, and accessibility improvements, to Building 7.

    $263K
  • 2024Build Alt Comm

    Upgrades and repairs – including kitchen, bathroom, and accessibility improvements – building 13.

    $158K
  • 2024Build Alt Comm

    Upgrades and repairs, including kitchen, bathroom, and accessibility improvements, in Building 14.

    $150K
  • 2024Build Alt Comm

    Upgrades and repairs, including kitchen, bathroom, and accessibility improvements, in Building 3.

    $128K
  • 2024Build Alt Comm

    Upgrades and repairs, including kitchen, bathroom, and accessibility improvements, in Building 2.

    $200K
  • 2024Build Alt Comm

    Upgrades and repairs, including kitchen, bathroom, and accessibility improvements, in buildings 5 and 6.

    $475K
  • 2024Build Alt Comm

    Upgrades and repairs, including kitchen, bathroom, and accessibility improvements, in Building 8.

    $153K
  • 2024Build Alt Comm

    Upgrades and repairs, including kitchen, bathroom, and accessibility improvements, in Building 10.

    $118K
  • 2024Build Alt Comm

    Upgrades and repairs, including kitchen, bathroom, and accessibility improvements, in Building 4.

    $198K
  • 2024Build Alt Comm

    Upgrades and repairs, including kitchen, bathroom, and accessibility improvements, Building 12.

    $118K
Satellite view of 40 Stillwater Ave, Stamford, CTSatellite view
2022

40 Stillwater Ave

Stamford, CT
  • 2022Renovation

    Select renovation of 89 units in 13 story building, approximately 83k sf to include but not limited to kitchens, bathrooms, flooring, and MEP fixtures. 6 units to be converted to be UFAS compliant. NOTE: Project cost includes MEP amounts.

    $1.1M
  • 2022Building Permit

    Remove and clean the exterior brick horizontal control joints, then install new caulking and backer rod. Install weep tubes and sealant in the joints.

    $71.9K
Satellite view of 10 Riverside Ave, Greenwich, CTSatellite view
2020

10 Riverside Ave

Greenwich, CT
  • 2020Roofing

    ZONE 4 KITCHEN Unit 3. 0. 7 Siding and window replacement, central HVAC plant replacement, add condensate drain pans under hear pumps in resident units, paint in all 38 units. 4 ADA kitchen renovations, add smoke/co detectors in all 38 units, lobby/library area flooring/lighting/painting. State ed fee paid $198.90 electrical: (ON HOLD) add smoke/co in units; rewire for new boilers, disconnect/reconnect air conditioning and add rooftop receptacles, change lights in lobby; 10 outlets, 40 light fixtures.

    $765K
  • 2020Roofing

    ZONE 5 KITCHEN Unit 3. 0. 6 Siding and window replacement, central HVAC plant replacement, add condensate drain pans under hear pumps in resident units, paint in all 38 units. 4 ADA kitchen renovations, add smoke/co detectors in all 38 units, lobby/library area flooring/lighting/painting. State ed fee paid $198.90 electrical: (ON HOLD) add smoke/co in units; rewire for new boilers, disconnect/reconnect air conditioning and add rooftop receptacles, change lights in lobby; 10 outlets, 40 light fixtures.

    $765K
  • 2020Roofing

    Zone 1 living room: siding and window replacement; central HVAC plant replacement; add condensate drain pans under heat pumps in resident units; paint in all 38 units; renovate 4 ADA kitchens; add smoke/CO detectors in all 38 units; and flooring, lighting, and painting in the lobby/library area. State education fee paid: $198.90. Electrical (on hold): add smoke/CO detectors in units; rewire for new boilers; disconnect and reconnect air conditioning; add rooftop receptacles; change lights in the lobby; 10 outlets; 40 light fixtures.

    $765K
  • 2020Roofing

    ZONE 3 KITCHEN Unit 2. 0. 3 Siding and window replacement, central HVAC plant replacement, add condensate drain pans under hear pumps in resident units, paint in all 38 units. 4 ADA kitchen renovations, add smoke/co detectors in all 38 units, lobby/library area flooring/lighting/painting. State ed fee paid $198.90 electrical: (ON HOLD) add smoke/co in units; rewire for new boilers, disconnect/reconnect air conditioning and add rooftop receptacles, change lights in lobby; 10 outlets, 40 light fixtures.

    $765K
  • 2020Renovation

    Siding and window replacement; central HVAC plant replacement; add condensate drain pans under heat pumps in resident units; paint in all 38 units; 4 ADA kitchen renovations; add smoke/CO detectors in all 38 units; and flooring, lighting, and painting in the lobby/library area. State education fee paid: $198.90. Electrical: Add smoke/CO detectors in units; rewire for new boilers; disconnect and reconnect air conditioning; add rooftop receptacles; change lights in the lobby; 10 outlets; 40 light fixtures. HVAC: Replace cooling tower, 4 boilers, and 2 hot water storage tanks.

    $765K
  • 2020Roofing

    ZONE 8 COOLING TOWER Siding and window replacement, central HVAC plant replacement, add condensate drain pans under hear pumps in resident units, paint in all 38 units. 4 ADA kitchen renovations, add smoke/co detectors in all 38 units, lobby/library area flooring/lighting/painting. State ed fee paid $198.90 electrical: (ON HOLD) add smoke/co in units; rewire for new boilers, disconnect/reconnect air conditioning and add rooftop receptacles, change lights in lobby; 10 outlets, 40 light fixtures.

    $765K
  • 2020Roofing

    ZONE 2 LOBBY Siding and window replacement, central HVAC plant replacement, add condensate drain pans under hear pumps in resident units, paint in all 38 units. 4 ADA kitchen renovations, add smoke/co detectors in all 38 units, lobby/library area flooring/lighting/painting. State ed fee paid $198.90 electrical: (ON HOLD) add smoke/co in units; rewire for new boilers, disconnect/reconnect air conditioning and add rooftop receptacles, change lights in lobby; 10 outlets, 40 light fixtures.

    $765K
  • 2020Roofing

    ZONE 7 MECHANICAL ROOM Siding and window replacement, central HVAC plant replacement, add condensate drain pans under hear pumps in resident units, paint in all 38 units. 4 ADA kitchen renovations, add smoke/co detectors in all 38 units, lobby/library area flooring/lighting/painting. State ed fee paid $198.90 electrical: (ON HOLD) add smoke/co in units; rewire for new boilers, disconnect/reconnect air conditioning and add rooftop receptacles, change lights in lobby; 10 outlets, 40 light fixtures.

    $765K
  • 2020Roofing

    ZONE 6 KITCHEN Unit 3. 1. 4 Siding and window replacement, central HVAC plant replacement, add condensate drain pans under hear pumps in resident units, paint in all 38 units. 4 ADA kitchen renovations, add smoke/co detectors in all 38 units, lobby/library area flooring/lighting/painting. State ed fee paid $198.90 electrical: (ON HOLD) add smoke/co in units; rewire for new boilers, disconnect/reconnect air conditioning and add rooftop receptacles, change lights in lobby; 10 outlets, 40 light fixtures.

    $765K