Reroute plumbing for the basement toilet, tub, and vanity, and install a washer connection from septic to sewer. Redo plumbing for the new location and replace old drain lines from ABS to PVC, as needed. Replace old Poly-B.
Rough and trim REMOVE EXISTING for full bath, laundry, kitchen move some heat element around AND INSTALL NEW ASPHALT SHINGLES ON ROOF WITH ALL REQUIRED.
Renovate the master bathroom and secondary bathroom with no changes to the existing layout. Renovate the kitchen with no changes to the existing layout.