51 Grandview Ave
Norwalk, CT- 2025Plumbing
Installations of 3 toilets, 3 sinks, vanity 3 faucets, 1 tub drain set, 1 shower, 1 kitchen sink faucet, and ejector pump+ cover 6 new valves.
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
No contact information was found in the available records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Installations of 3 toilets, 3 sinks, vanity 3 faucets, 1 tub drain set, 1 shower, 1 kitchen sink faucet, and ejector pump+ cover 6 new valves.
Installation of gas lines for 1 stove, 1 gas dryer, wall-hung hot water heater, and gas furnace.
$1.7KRough-in and installation of 2 toilets, 2 sinks and faucets, 1 tub, 1 shower, 1 kitchen sink and faucet, and a washer.
$3.3KRough-in and installation for one regular sink and one mop sink and faucet.
$2KRough in sewer lines for the first-floor toilet, tub, and sink, and the second-floor toilet and sink.
$1.6KInstallation of hot and cold water supply lines and installation of base board heat for 1st, second floor and basement.
$8.2KInstallation of baseboard heat for the 1st, 2nd, and 3rd floors. Inspect 3 existing gas furnaces and 3 hot water heats, as per approved plans on file.
$5KRough-in for 3 tubs, toilets, sinks, faucets, kitchen sinks, and faucets on three floors.
$10.5KBelt replacement for walk-in cooler.
$2K2 store front gas connections to meter.
$600Installation of 1 sink and toilet in store front and 1 electric water heater.
$5KInstallation of 6 toilets, 6 tubs, 6 lavatory sinks, 4 kitchen sinks, and 4 gas water heaters.
$20KRepair leaks in the gas line and perform an air test on the line.
$500Plumbing: Replace parts of the waste line from inside the basement to the sewer line outside the house. Emergency repair.
$4.5KInstallation of a shower, toilet, and vanity in the basement.
$2.5KTest gas line to the second floor.
$800Run supply and return heat line and new baseboard heat for second floor new addition.
$2.2KInstallation of (1) toilet, tub, and sink.
$6.5KInstallation of (2) tubs, (2) sinks, (2) toilets, and (2) kitchen sinks.
$2.5KRun gas lines for 1st and second floor hot water heater and gas stove (1 for each floor).
$1.1KPerform a gas test only on the existing gas line.
$500Install 40 gallon hot water heater and gas line.
$2KPlumbing: Sewer reconnect for (2) bathrooms, kitchen sink, dishwasher, and washing machine.
$2.5KMechanical: Remove and install a new gas boiler and gas piping from the meter to the wall-hung unit.
$4.5KPlumbing - install 3 sinks, waster piping water, and water p - Space K125 - "Cafe Oui".
$3KPlumbing: Kiosk 310 and prep kitchen ST 350, “Ramen.”
$5KPlumbing - waste and water, 1 compartment sink, 2 hand sinks, 2 mop sinks, 1 grease trap, 2 sub water meters, 2 tankless electric water heater wall hung and 1 ice machine - Space Kiosk K320 - "Cafe Poke".
$10KPlumbing for Space 1025, “Tutti Spa & Nails.”
$32KPlumbing: replace sewer from outside.
$8002 nw: showers, sinks, 1 nw: clothes washer.
Install 2 toilets, 2 sinks, a mop sink, 1 hot water heater, and 1 slop sink.
No a/r, no ductwork. A total of 28 air handlers; 23 wall-mounted units installed per room; units installed above the ceiling for the office, waiting room, and hallway. A total of 24 sets of supply takeoffs with diffusers, and a total of returns. Will be seated in the right backyard on a solid concrete between with anchor.
Second floor: 4 water closets, basins, 1 shower, and sink.
Mechanical: Remove 2 hot air furnaces and replace them with 2 new gas furnaces, wrap existing ducts in the basement, and install 2 new line sets and a condenser in the rear of the house.
$8KPlumbing: replace sewer line.
$2.5KPlumbing - run waste and water for 1 kitchen sink, 1 lavatory sink, 1 tub and 1 toilet, gas line for stove and hot water heater.
$8.5KPlumbing—sewer line.
$3.5KThird floor: 1 water closet, tub, and basin; waste, vent, and water; roughing and setting of fixture.
Plumbing: Water and waste piping for 2 toilets, 1 shower, 1 tub, and 2 bathroom sinks.
$5KMechanical: Remove and install boiler with 1 sprinkler over top.
$6KMechanical: Remove and install a combination hot water and heating system.
$4.8KPlumbing: Replace a section of sewer line 10 ft from the road to the property connection.
$600Mechanical: remove and install boiler and venting.
$5KPlumbing: Run water and waste for 2 new bathrooms on the second floor. 2 tubs, 2 hand traps, cabinet, and 2 toilets; connect to the existing waste line and water test on lines.
$10KPlumbing: install an ejector pump UG, waste piping, a tub, a cabinet and sink, and a water vent line for a fixture.
$5.8KPlumbing: Relocate tub, toilet, washer, and bathroom lav.
$4KMechanical: relocate baseboard.
$500Mechanical: Connect gas stove to gas line.
$1KFirst floor: 1 basin, sink.
First floor: 1 water closet, tub, basin, sink, laundry tub, clothes washer, and dishwasher. Second floor: 1 water closet, tub, and basin. Waste and water line; replace in new for toilet, tub, sink, and slop sink.
First floor: 1 water closet, 1 basin, 1 shower, 1 sink, 1 clothes washer, and 1 dishwasher. Second floor: 3 water closets, 2 tubs, 4 basins, 2 showers, and 1 laundry tub. Replace some water piping, waste and vent lines; install some new water lines and washers for the new bathroom; relocate the washer and dryer.
First floor: 1 water closet, basin, laundry tub, clothes washer, and dishwasher; Second floor: 1 water closet, tub, basin, shower, and sink; Third floor: 1 water closet, basin, and shower. Garage is removed; foundation is set and has been inspected. Living room, family room, den, and bedrooms with baths to be framed directly.
Install 2 hot air heating units: 1 on the third floor and 1 on the first floor. Run line set and 2 condensers outside. Amendment (9/15/17): moving condensers.