105 Leeuwarden Rd
Darien, CT- 2026Pool
Pool and/or Spa.
$75K
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Pool and/or Spa.
$75KAdd To & Alter
$600KAlteration
$500KPlumbing Work
Alteration
$75KAlteration
$950KDemolish the interior due to a fire and replace all interior fixtures in their existing locations. Revised work description: Raise the front and rear roof lines. Dated February 7,2025.
$250KInterior renovation: replace bathroom fixtures and install a new kitchen.
$44.8KAdd Master bedroom and renovation of master bathroom @second floor -deck off new master bedroom.
$98K2 story addition – renovations to first floor – 3 bedrooms, 6 bathrooms, kitchen, dining room – second floor renovation, master bath– proposed second floor balcony.
$1.4MPLU
PLU
ELE
Construction of a new pool house/cabana. State education fee paid: $26.00.
$100KConstruction of a new pool house/cabana. State education fee paid: $26.00.
Plumbing Work
Residential Building Permit Amendment 1
Alteration
$675KPlumbing Work
Building Permit
$1.8MBuilding Permit
$65KAmendment 2 - Res
$1KElectrical Work
HVAC Work
Legalize a previously built set of exterior stairs.
$1KFoundation / Earthwork
Building Permit
$4.8MAdd To & Alter
$1.3MRemoval of two chimneys and fireboxes. State education fee paid: $3.90. Amendment #1, 9/17/20: value $200,000; new kitchen and mudroom extension.
$15KPool pavilion, open on 4 sides, with shed attached. State education fee paid: $6.50. Electrical: Supply 2 circuits: the first for outlets and the second for general lighting for the pavilion.
$25KConstruction of a new single-family residence with 3 bedrooms, 2 full baths, 2 half bathrooms, a partially finished basement, an attached 4-car garage, and a porch/patio. State education fee paid: $325. Electrical: 100-amp temporary service; 4 devices.
Construction of a new single family residence, 3 bedrooms, 2 full baths, 2 half bathrooms, partially finished basement, attached 4 car garage, porch/patio. State Ed Fee Paid $325 HVAC : install 5 heat pumps system; all new ductwork; 1 boiler and indirect hot water tank 100 gallon. Radiant heat in first floor. And garage second floor; hydro air system; 1 erv system, 8 bathroom exhaust. Fans, kitchen exhaust and fresh air system electrical: 100-amp temporary service; 4 devices. Amendment (5/28/20): 125 devices installed; 400-amp underground service; install outlets and lighting electrical(2)(VOID) : Install 125 devices, range, oven, clothes dryer, air conditioning, oil burner, circ. Motor, range top, dish washer, water heater, gas burner, Install 400-amp underground service5533 electrical (3): low voltage hard wired smoke, heat and co dets.; all doors, first floor. Windows, motion, lowair temp. and flood sensors PLUMB: install plumbing underground PLUMB (2): basement: 1 nw: water closet, basin, shower; First floor: 3 nw: water closets, 4 nw: basins, 2 nw: sinks, 3 nw: dshwshrs., 4 nw: hose bibs, 1 nw: tub, shower; Second floor: 3 nw: water closets basins, 1 nw: tub, 2 nw showers; nat. Gas piping to 1: stove, boiler, log starter, pool htr. And firepit.
$1.3MSuperstructure - new single-family residence - 2/5 sty, 4 bedrooms, 3/5 bath and 1/2 sty. Attic.
$850KFoundation -2 sty. Single-family residence - 4 bedrooms and)3 1/2) baths.
$50KConstruction of site walls for a future building project. State education fee paid: $7.80.
$30KConstruction of site Walls for future building project. State ed fee paid $7.80.
$30KNew construction of a single-family home under the 2009 IRC, with a finished basement, attached 2-car garage, and rear porch. State education fee paid: $286.00. Final value dated 7.31.17: $25,950; fee: $344.76. In accordance with Section R314.2, CSBC, the household fire alarm system installed under this permit is required to be owned by the owner. The owner is responsible for having the system maintained in accordance with NFPA 72 and monitored by an approved supervising station in accordance with NFPA 72.
$1.1MNew construction of a single-family home with a finished basement, attached 2-car garage, and rear porch. State education fee paid: $286.00. Plumbing: install plumbing underground.