Skip to content

Local provider profile

M & E Innovative Home Solutions LLC

Documented work across Connecticut based on attributed municipal records.

Reported work volume$228KDocumented jobs
Average project$38KWhere values are reported
First observed2022Available dataset
Categories5Observed work types
Used for work inStamford5 jobsDarien1 jobs

Contact information

Details found in public records

These details have not necessarily been claimed or independently confirmed by the provider.

No contact information was found in the available records.

Work history

Documented work by property

Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.

Satellite view of 141 Franklin St, Stamford, CTSatellite view
2026

141 Franklin St

Stamford, CT
  • 2026Electrical

    The restrooms are being repaired the sf of each of the restroom is 195sfThis estimate includes labor, materials, and permits required for the alteration of 4 bathrooms, as outlined below:1. Plumbing Fixtures; Removal and replacement of existing toilets.; Installation of two 2 new sinks per bathroom (as applicable).; Proper connection to existing plumbing systems. 2. Shower Modifications; Modification of 1 shower to comply with handicap/ADA regulations, including necessary adjustments to access, layout, and functionality.; General shower modifications and repairs where required. 3. Tile Repairs; Repair and replacement of damaged or loose tiles as needed in shower areas, walls, or floors.; Tile work limited to affected areas only (not full re-tiling unless otherwise agreed). 4. Wall Alterations; Alterations and repairs to walls adjacent to sinks where needed to accommodate new fixtures or correct damage.; Surface preparation for finishing. 5. Painting; Interior painting of bathroom walls and ceilings after repairs are completed.; Paint color to be selected or approved by the owner. 6. Deep Cleaning on tiles will be done; Job site cleanup upon completion of work.; Removal of construction debris related to the project. 7. Connect emergency toilet alarm; And some electrical work as needed. ADA Partitions will also be supply and mirrors. Exclusions / Additional WorkAny work not specifically listed above will be considered outside the scope of this estimate. Additional repairs or changes discovered during construction will be discussed and approved by both the owner and contractor prior to execution.

    $95K
Satellite view of 2701 Summer St, Stamford, CTSatellite view
2024

2701 Summer St

Stamford, CT
  • 2024Demolition

    Demolition of some partition walls, as shown in the floor plan.

    $35K
Satellite view of 284 Glenbrook Rd, Stamford, CTSatellite view
2023

284 Glenbrook Rd

Stamford, CT
  • 2023Renovation

    Basement Renovation: will have an office, bathroom, bedroom, sitting area, wet bar, and washer/dryer. Our proposed plans have undergone an in-person review with the zoning department officer, resulting in their approval for further progress within the buidling department. Additionally, a zoning inspector conducted an inspection at the premises, with both assessments receiving approval to proceed with the building department.

    $38K