Construct a pool house (909 square feet) with a basement finished area of 725 and 714 unfinished, with one full bathroom, a changing area with a shower, a living room with a wet bar, and a study with 2 closets. Adding retaining walls.
Change of use from dry-cleaner to retail, ice-cream store at 597 Newfield Avenue (Unit 9 of Newfield Green). Interior fit-out for a new ice cream shop within an existing retail tenant space. Ice cream is not to be manufactured at this store; it is only to be sold and serviced to customers. Add a new exterior walk-in freezer. No other exterior work. Change of use to accommodate a new ice cream shop. General scope of work includes: 1. Full interior fit-out. 2. Alterations to electrical and plumbing systems. 3. New exterior walk-in freezer to accommodate ice cream shop equipment. Use Group: B. Construction Type: IIB. Non-sprinklered. Occupant Load: 25. Building Code: 2022 CSBC.
$200K
2019Electrical
Replacement of the existing signs with new tenant name. One by the street on the main Newfield Green sign. And second above the entrance to the tenant restaurant. Electrical permit.
Phase 1 renovation: interior framing with plumbing, electrical, and HVAC for the deli’s first-floor prep/storage area in the basement and the two-bedroom apartment on the second floor. Future Phase 2, after MEP plans are completed, will include installation of the grease trap, hood, and kitchen equipment.
Remove the roof above the back second floor to construct a new exterior dining patio on the second floor and a new exterior rear staircase.
$125K
2020Renovation
Interior renovation of the first floor. Changing the finish on the walls and painting. Adding pizza oven and 2 sinks in the back room. 5/8/20-Fire Marshal approval required for pizza oven and hood-MTC.
Renovations of 2 1/2 existing bathrooms on the first floor. Raise existing living room floor to be flush with first floor. Move the laundry appliances from the mudroom to the master bedroom closet. In the lower level install new fire rated doors to the mechanical room and garage. In the lower level remove not structure wall between hallway and family room. Install new water radiant heat for the first floor and lower level. RevisedIn the lower level removal of the non structure walls to create one large bedroom from the bedrooms #5 and #6. Framing of a double closet in the new larger bedroom. MJS Dated April 13th 2022.5/27/2022- air conditioning added to scope of work-MTCRevise to add replacement of existing generator- MJS Aug 9,2022 Cost of Generator $10,000.
Legalization of previously permitted and inspected work under building permit # 56308. This was to add a third unit in the lower level to an existing 2 family house. Making the house three family.
Remove the existing roof and install a new roof over the existing garage. Remove the siding and replace it with new clapboard at the back and left side of the house.
Renovate the existing lower-level bathroom. At the back of the existing garage, on the inside, construct 2 walls for a new laundry room/mudroom. State education fee paid: $7.28. HVAC: Add a supply duct to the new laundry room. Plumbing: Relocate plumbing for a toilet, lavatory sink, and tub/shower; install new plumbing for a washing machine; install new gas piping for a dryer; connect the new gas stove in the kitchen to the existing gas pipe. First floor: Move 1 water closet, tub, and sink; install 1 new clothes washer. Electrical: 7 switches, 13 outlets, and 22 light fixtures. 100-amp existing service. Install 22 recessed lights with LED trims; install 7 new switches; upgrade the electrical panel from 12 circuits to, 30 circuits, 100-amp; relocate the washer and dryer circuits to a new location.
Interior renovation of the exist'g kitchen constructing new walls in the exist'g garage for new mudroom and relocation of powder room. Construct bigger openings to living and dining room. Ext. Renovatin with adding 2 new dormers to the exist'g second floor bdrms and new front portico. State ed fee paid $37.70 electrical: NEC. Reuse existing circuits for kitchen ands kitchen counter; add 17 recessed lights in kitchen; add additional 15 recessed lights; add additional 4 switches; relocate 5 existing lights to new locations; add smoke/co dets. Per code electrical: NEC. Reuse existing circuits for kitchen ands kitchen counter; add 17 recessed lights in kitchen; add additional 15 recessed lights; add additional 4 switches; relocate 5 existing lights to new locations; add smoke/co dets. Per code PLUMBING: IRC. Plumbing for existing kitchen and new half bathroom; 1: kitchen sink, 1 gas stove, 1 new toilet, 1 new lavatory sink; new half bath plumbing to tie into existing. First floor: 1 nw: water closet, sink HVAC: install 2 hydro heating and cooling systems with all nec. Ductwork to heat and cool house; total of 4 tons. Provide venting for all bathrooms., dryer, and kitchen hood; ADP air handlers and trane condensing units will be used.
Interior office renovation for SIG Insurance. Applicable code: 2018 CT State Building Code. Construction type: 3B; use group: B; occupancy: 34. Automatic sprinklers: not required and not provided.
Selective non-structural demolition with life-safety stay-in-place for the future coffee shop. Revised to include tenant fit-out with a kitchen and grease trap. Approximately 3,600 SF.
Renovate the existing master bathroom on the second floor. All fixture locations will stay the same. Trades needed for this jobsite project: electrical and plumbing.
Interior renovation of the 1/2 bathroom, bedroom, and kitchen, including removal and some relocation of interior walls. State education fee paid: $27.30. Electrical: Furnish and install 13 outlets, 20 lights, 5 dedicated circuits for lights, and 3 outlets; relocate existing outlets. Plumbing on the fifth floor: Replace 2 water closets and basins; replace 1 dishwasher, sink, and tub; install 1 new clothes washer; gas pipe.