After the fact-rear dormer for full bathroom 11-by-15-foot existing plumbing, stand up shower bathtub, double sink, toilet, hydronic 4 ft baseboard.
$1K
2025Plumbing
First floor, remove and install new toilet, install vanity sink and faucet with new p-trap drain assembly, install valve shutoff at main water supply. Pressure test gas lines to house, 2 nd floor-Previously installed fixtures, sink, toilet and tub If up to code.
Re-pipe hot and cold geed lines in house with pex piping, install laundry pump with laundry sink and washer machine set up, install 2 shower tub valves, install 2 tus, replace 40 g hot water heater and install, and 2 vanity sinks and 2 toilets.