30 Woodland Pl
Wilton, CTPlumbing/Gas Permit
$2KLocal provider profile
Architect · Gensler
Documented work across Connecticut based on attributed municipal records.
Enriched provider details
Supplemental data supplied by FullContact and stored separately from public records.
With nearly three decades of experience in visual effects, animation and production, I currently manage multiple roles that allow me to contribute and shape the industry: - Image Engine Visual Effects Executive Producer (since 2006) - Image Engine Head of Visual Effects Production / General Manager (since 2015) - Cinesite Group Chief Operating Officer for VFX (since 2023) As Chief Operating Officer for Cinesite's VFX Group, I oversee visual effects production across Cinesite’s locations in London and Montreal, Image Engine in Vancouver, and Trixter in Munich. My responsibilities range from driving production management for complex, high-profile projects to ensuring that our work meets the evolving creative and technical demands of the industry. In addition to the role of Cinesite COO of VFX, I am also Head of Visual Effects Production, General Manager, and Visual Effects Executive Producer at Image Engine, where I’ve been since 2005. I play a pivotal role in establishing and growing the studio. Under my leadership, Image Engine has become a key player in the visual effects industry. I’ve led major projects such as District 9, which earned an Academy Award nomination for Best Visual Effects, and Elysium, where I took on the role of Visual Effects Producer for the production. My leadership on Elysium contributed to earning the 2014 Leo Award for Best Visual Effects in a Motion Picture. My journey — from visual effects artist to leading visual effects production, to helping shape Image Engine into a competitive force — reflects my passion for pushing the boundaries of visual effects production. I’m excited to continue contributing to the ever-evolving landscape of the visual effects industry!
FullContact query stored 2026.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Plumbing/Gas Permit
$2KRough in-install fixture for new master bathroom and laundry - 1 tub, 1 toilet, 1 vanity, 1 washing machine.
$6.9KReplacing fixtures in master bath (swapout) new bathroom third floor, 1 water closet, 1 vanity, 1 shower.
$9.4KRough in + install fixtures for new bathroom in basement, 1 shower, 1 toilet, 1 vanity, put w.m box in whose old make up exist, reintall laundry swash.
$7.5KRough in + install fixtures for new bathroom in basement, 1 shower, 1 toilet, 1 vanity, put w.m box in whose old make up exist, reintall laundry swash.
$7.5KReplace existing baseboard with new baseboard and make the basement a separate zone.
$2.5KRough in and install 1 hand sink and 1 mop sink.
$1.9KNew master bathroom on the first floor: 1 shower, 1 toilet, 1 marble vanity, and 1 tub.
$6KRough-in for water and drain for washing machine.
$900Run a gas line from the outside meter bar to a new gas dryer, with future tees for a heat unit and stove.
$800Run a gas line from the meter to the laundry room for a future gas dryer.
$650Run new gas line for mater to new heater in sun room and install vent less heater.
$1.8KGas line in the house for a stove and future heat.
$650Replace the leaky water heater with an on-demand water heater.
$3.6KRough in and insulate fixtures for 1 kitchen sink and dishwasher, 1 tub, shower, 2 single variety,. 2 double vanity, 3 water closets, 1 gas water heater.
$12KRough in and insulate fixtures for 1 kitchen sink and dishwasher, 1 tub, shower, 2 single variety,. 2 double vanity, 3 water closets, 1 gas water heater.
$12KGas pipe to 2 heat units, 1 water heater, and 1 stove.
$2KRun a gas line for a gas fireplace and future boiler.
$800Run a gas line from the meter to a future gas boiler and water heater.
$800Rough in for 1 toilet, lavatory and tub on third floor.
$3.6KRun a new gas line from the meter to the new gas boiler.
$650Move master toilet, change 2 vanity's, change valves, 2 showers, change master tub, new faucet and sink kitchen.
$3.2KRough-in for a new master bath: (1) toilet, (1) shower, (1) tub, and double vanity.
$10KRough in the sewage ejection pump tub, vanity, and toilet underground; set fixtures.
$5.6KRemove the existing gas line and replace it with a new gas line, and install a new water heater.
$2.7KRe-pipe plumbing to the sink and others as per inspector.
$600Retest existing gas line to third floor apt.
$350Mechanical: Install a new combi unit and run a gas line to the side location for a propane tank.
$6.5KMechanical: Install new baseboard in finished basement.
$1.2KMechanical: Install new baseboard in finished basement.
$1.2KPlumbing for a bar sink in the finished basement.
$1KPlumbing: finish rough-in on handicap powder room; set toilet and sink.
$1.5KPlumbing: water heater.
$3.1KPlumbing: water heater.
$3.1KMechanical: Run a gas line to a new meter box.
$350Install a new boiler.
$6.1KMechanical: new gas line to stove only.
$1.2KMechanical: Replace 25' of gas line in the garage.
$600Mechanical: Run a gas line to a new stove, future generator, and fireplace.
$2.2KMechanical: Run a gas line to a new stove, future generator, and fireplace.
$2.2KMechanical: Extend existing baseboard into the kitchen addition and new powder room.
$5KPlumbing: rough-in and insulate for 1 toilet, 1 vanity, 1 kitchen sink, and ice maker.
$2KPlumbing: Remove the washing machine hookup and pipe for a shower in the existing powder room with a washing machine.
$900First floor: 1 sink. Move plumbing for new kitchen sink; move gas line for new cooktop.
Plumbing - swap out fixtures in kitchen - 1 sink and 1 dishwasher - swap out fixture in bathroom -, 1 toilet and 1 vanity.
$1KMechanical: Run a new line for a future gas fireplace/log set.
$800Mechanical: Run a gas line from the existing line to a new gas fireplace.
$875Mechanical: Run a gas line to a new hot air unit (air test).
$650Mechanical: Install 275 vertical oil tank at the rear, on a cement pad.
$2KInstall Big Dipper grease trap and 3 bath sinks (existing) at “Angela Mia Bakery.”
$1.9KPlumbing: Cap off the kitchen sink drain and domestic water pipe.
$350Mechanical: replace 2 gas boilers.
$10KMechanical: Run a new gas line to the existing meter and install a new boiler. Remove the propane line.
$1.6KPlumbing: Install wall-hung sink and toilet.
$1.9KSecond floor: 1 sink, shower, and water closet.
Run gas line from exist. gas meter to pool htr.
Plumbing for a bathroom in the basement.
$3.5KPlumbing: remodel the powder room and kitchen on the first floor, and future bath over the garage.
$3KPlumbing: remodel the powder room and kitchen on the first floor, and future bath over the garage.
$3KMechanical: Run a propane gas line to a new stove.
$650Plumbing - AFTER THE FACT - bath - 1 toilet, 1 vanity, 1 shower - Must expose all plumbing.
$17Plumbing - 2 salon chairs, 1 hand sink and color sink.
$2.3KPlumbing - install complete bathroom in basement - 1 water closet, 1 vanity, 1 shower and 1 washing machine.
$3.8KMechanical: Run an underground gas line from the meter to the pool filters.
$1.5KPlumbing - remodel 2 baths (2 water closets, 2 vanities, 2 showers).
$3.6KFirst floor: replace sink and dishwasher.
First floor: move 1: sink (relocate), shower and dwhwshr. Also. Amendment (11/21/17): basement: move clothes washer; First floor: replace water closet, move: sink, dishwasher, new shower; run gas line to unit.