225 High Ridge Rd
Stamford, CTNew tenant fit-out for Alcority.
$1.2MLocal provider profile
Documented work across Connecticut based on attributed municipal records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
New tenant fit-out for Alcority.
$1.2MInterior alterations and renovation of the current showroom space. State education fee: $26.
$100KInterior alterations and renovation of the current showroom space. State education fee: $26.
$100KRenovation of showroom space on the first floor. State education fee paid: $6.50. Amendment #1 (12.16.19): value $700,000; fee $10,722. Work includes moving some walls, rearranging lighting, possibly HVAC, flooring, and display cases. Electrical: 37 devices installed; install light fixtures, receptacles, and branch wiring; 25 new recessed lights; 6 walk-in foods for furniture lighting, 2 infoods for signage, and 4 recessed poke-thru receptacles; reuse existing branch wiring and switchlegs; selective demolition. Amendment (12/26/19): replace existing fixtures with new ones; replace floor outlet with new covers.
$25KInterior facelift, new siding, and signage (needs separate permit) for Alltown gas station.
$50KCommon area renovations to restrooms; remove stair, corridor ceiling, and lighting.
$230KTenant: “Joy Food.”
$200KInterior tenant fit-out for “Ziering Medical”: new walls, ceiling, plumbing, HVAC, electrical, and finishes. State education fee paid: $39. HVAC: relocate grills. Electrical: install new lights in medical space; new outlets and switches for fit-out. Plumbing: Third floor: 1 water closet and 6 sinks; rough-in for 4 exam sinks and 1 pantry sink; rough-in for ADA bathroom; rough-in for shampoo bowl; install 20-gallon AO Smith water heater. Drainage and vent shall be no-hub cast iron; water shall be copper with 1/2-inch think insulation. Plumbing (2): relocate sprinkler heads to accommodate new ceiling grid.
$150KBuilding
$50KBuilding
$50KBuilding
$439KLessee: Granoff Architects. Free-standing business sign, 13.33 sf; wall business sign, 4 sf. Electrical: run underground conduit for sign light.
$8KLessee: Granoff Architects. Free-standing business sign, 13.33 sf; wall business sign, 4 sf. Electrical: run underground conduit for sign light.
$8KLessee: Workwell Win. Interior fit-up on the second floor. State education fee paid: $117.00.
$450KTenant fit-out on the second floor. State education fee paid: $39.00. Plumbing: On the third floor, 2 sinks; run waste on the first-floor ceiling; run hot, cold, and vent to bathrooms. Electrical: 50 devices installed; install 20 lights, 20 outlets, and 10 switches; relocate 100 electrical panel. HVAC: New ductwork and grills.
$150KTenant fit-out. First floor. State education fee paid: $39.00. Electrical: 66 devices installed; First floor: install 30 new lights, 10 new light switches, 18 new outlets, 4 new exit signs, and 4 fire alarm devices. Plumbing: First floor: 1 sink; run cast-iron for waste and vent, and copper for waterlines. HVAC: new ductwork and grills.
$150KInterior tenant fit out - Tenant space 4 - for Basement level State ed fee paid $16.90 PLUMB: First floor: 1 water closet, shower, sink dishwasher HVAC: ductwork, grills to be attached to existing unit electrical: wire 20 new lights and 20 new outlets electrical (2): security alarm and access control system installed.
$65KTenant fit-out on the second floor. State education fee paid: $39.00. Electrical: 97 devices installed; on the second floor, 30 new lights, 15 new light switches, 40 new outlets, 6 new exit signs, and 6 new fire alarm devices. Plumbing: on the second floor, 1 sink; run waste in the first-floor ceiling; run vent, hot, and cold to the existing bathroom. HVAC: new ductwork and grills.
$150KInterior office fit-out on the first floor. State education fee paid: $61.10. 11.2.16 change of contractor: $40. HVAC: Grills, VAVs, and ductwork as shown on plans. Electrical: Tenant fit-up with 50 outlets, 100 light fixtures, and a new 100-amp electrical panel. Electrical (2): TV and audio wiring in the conference room. Plumbing on the First floor: 1 water closet and 3 sinks; run PVC for drain and vent, and run copper for water with 1/2 fiberglass insulation.
$235KRemoval of interior finishes for a future Sun River Management project, including interior sheetrock, ceiling tiles, some lights, flooring, and millwork. State education fee paid: $2.60. Amendment #1, dated 10.25.19: value $225,000; fee $3,473.50. Remodel walls, floors, and ceiling; seating plan remains the same.
$10KBuilding
$150KLessee: Caldwell Banker. Tenant interior fit-up. State education fee paid: $91.00. HVAC: Install 6 indoor package units; install all piping and drain line. HVAC (2): Ductwork and grilles on landlord-installed units. Electrical: CAT 6 cabling only. Electrical (2): First-floor tenant fit-out; install 20 occupancy sensors, 100 light fixtures, and 75 receptacles (all electrical panels existing). Plumbing: First floor: 2 sinks, 1 dishwasher; run cast iron for waste and vent; run copper with fiberglass insulation; install 20-gallon water heater in ceiling.
$350KLessee: JoJo Maman Be Be wall sign (10 sf).
$1KLessee: JoJo Maman Be Be wall sign (10 sf).
$1KLessee: JoJo Mama. Interior tenant fit-out. State education fee paid: $18.20. Amendment #1, 4.17.18: $40 fee; new millwork and paint of the front entrance fascia (no change in SF for the new site). Amendment #2, 4.30.18: $10,000 valuation; $212.60 fee; close the existing entrance vestibule to create a new facade.
$70KLessee: JD Capital Mngmt LLC. Removal of interior finishes, masonry, and structural steel. State education fee paid: $9.10. Amendment #1 dated 10.26.18: valuation $750,000; fee $11,485. Interior tenant fit-out with new walls, ceilings, electrical, plumbing, sprinkler, HVAC, and finishes.
$35KLessee: Longitude Commercial. Tenant interior fit-up on the first floor. State education fee paid: $20.80.
$80KTenant: Performance Trust Capitol Partners. Minor interior alteration: remove two walls and build one new wall. Electrical work to the new trading desk. State education fee paid: $2.60.
$10KBuilding
$150KLessee: Karp Reilly. Interior tenant fit-out from office to office. State education fee paid: $24.70.
$95KLessee: Karp Reilly. Interior tenant fit-out from office to office. State education fee paid: $24.70.
$95KRemoval of existing awning and relocation of stair entry to Greenwich Ave. Redo signed story facade: 2 new wall sconces. State education fee paid: $20.80. Electrical: demolish 1 pendant and 2 track lights; install 4 recessed lights and 2 sconces in new vestibule.
$80KNew restroom. State education fee paid: $3.90.
$15KTenant renovations for Liberty Mutual.
$50KBuilding
$30KLessee: Estate Treasures. Interior fit-up for retail consignment shop. State education fee paid: $26.00.
$100KLessee: Estate Treasures. Interior fit-up for retail consignment shop. State education fee paid: $26.00.
$100KLessee: Belly and Body interior fit-up for fitness facility. State education fee paid: $39.00. 2.15.17 change of contractor: $40.
$150KBuilding
$35K